{
  "docId": "019de510-cca3-72bf-aa10-03c46d6a2f69",
  "docSlug": "be9c03f8264ad65617ab9f992ee69292",
  "documentTitle": "Vale | Investor Presentation Deck | 55 slides",
  "authorId": "vale",
  "authorName": "Vale",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2021-04-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 15,
  "pageCount": 55,
  "prevPage": 14,
  "nextPage": 16,
  "slideType": "propose_solution",
  "function": "present_solution",
  "density": "balanced",
  "nDataPoints": 9,
  "notes": "The slide uses a combination of geographic mapping, process-oriented strategy descriptions, and a stacked bar chart to illustrate the path to 400 Mtpy capacity.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de510-cca3-72bf-aa10-03c46d6a2f69/15",
  "deckHref": "/decks/019de510-cca3-72bf-aa10-03c46d6a2f69",
  "deckJsonHref": "/decks/019de510-cca3-72bf-aa10-03c46d6a2f69.json",
  "deckAnchorHref": "/decks/019de510-cca3-72bf-aa10-03c46d6a2f69#slide-15",
  "components": [
    {
      "bbox": {
        "h": 0.5,
        "w": 0.35,
        "x": 0.62,
        "y": 0.36
      },
      "kind": "chart",
      "text": "Production and capacity (Mtpy)",
      "attrs": null,
      "subkind": "bar-stacked",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "25287cd4-5c29-4d12-859b-0bd9e070c0e9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.4,
        "w": 0.12,
        "x": 0.048,
        "y": 0.44
      },
      "kind": "image",
      "text": "Regional maps of Brazil",
      "attrs": null,
      "subkind": "map",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "2b81bc23-6ef3-4176-a2b8-3beea619ac4a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.4,
        "w": 0.55,
        "x": 0.048,
        "y": 0.44
      },
      "kind": "list",
      "text": "Northern System: Ramp-up and open new mining fronts; Southeastern System: Develop filtering and dry stacking capacity; Southern System: Solve interference of upstream dams",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b241f87f-79c0-4f03-94b2-737e55fe33c1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.12,
        "w": 0.68,
        "x": 0.048,
        "y": 0.188
      },
      "kind": "title",
      "text": "Resuming 400 Mtpy iron ore capacity is a careful and complex task",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "2d605fef-11b3-4e1b-8fb9-f7c6fb726bd8",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "5a7525df-c45b-4fb9-95fc-250f8b3d7c9d",
      "evidence": "list/bullet: Northern System: Ramp-up and open new mining fronts; Southeastern System: Develop filtering and dry stacking capacity; Southern System: Solve interference of upstream dams",
      "confidence": 0.7
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 46,
      "from": 15,
      "beatId": "a683fb4a-c3b7-4d8a-baf1-8d90d71a86ad",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Solution & Approach",
      "beatSlug": "consultants-gambit-solution-approach",
      "evidence": "Slides 15-46 outline Vale's solution and approach to building a better future.",
      "position": 2,
      "confidence": 0.8,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [
    {
      "to": 23,
      "from": 15,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "fd2f4146-d595-4f03-9ffa-7ef0caaa0ff8",
      "evidence": "Slides 15-23 discuss the importance of resuming iron ore capacity and maximizing flight to quality.",
      "position": 0,
      "objective": "To highlight the cost of inaction and the benefits of Vale's strategy",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.6,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}