  "docId": "019de50f-b4de-7299-801c-dec96f3190bf",
  "docSlug": "396da336ad0fa0cca0fbdf9c932fc880",
  "documentTitle": "NW Natural Holdings | Investor Conference Presentation Deck | 49 slides",
  "authorId": "nw-natural-holdings",
  "authorName": "NW Natural Holdings",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2020-05-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 43,
  "pageCount": 49,
  "prevPage": 42,
  "nextPage": 44,
  "slideType": "other",
  "function": "establish_context",
  "density": "dense",
  "nDataPoints": 2,
  "notes": "The slide uses an infographic map to illustrate the physical connection between the North Mist storage facility, the Port Westward power plant, and the Columbia Gorge wind energy area.",
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de50f-b4de-7299-801c-dec96f3190bf/43",
  "deckHref": "/decks/019de50f-b4de-7299-801c-dec96f3190bf",
  "deckJsonHref": "/decks/019de50f-b4de-7299-801c-dec96f3190bf.json",
  "deckAnchorHref": "/decks/019de50f-b4de-7299-801c-dec96f3190bf#slide-43",
  "components": [
    {
      "bbox": {
        "h": 0.5,
        "w": 0.85,
        "x": 0.08,
        "y": 0.42
      },
      "kind": "image",
      "text": "Map showing North Mist facility, 13M pipeline, Port Westward plant, Columbia River, and Columbia Gorge wind farms.",
      "attrs": null,
      "subkind": "infographic",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b5edbc46-cbc7-4f8d-8713-b35e16a3d9be",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.85,
        "x": 0.07,
        "y": 0.23
      },
      "kind": "list",
      "text": "Unique no-notice 24/7 storage service supporting gas-fired electric generating facilities that are integrating wind into energy generation mix\n$149 million investment was immediately included in rate base once placed into service in May 2019\nContracted under 30-year agreement with single-customer (Portland General Electric)*",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "34c3f425-1600-4bbf-b1d3-8f06ce8cbda7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.35,
        "x": 0.6,
        "y": 0.95
      },
      "kind": "source-note",
      "text": "*Contract includes options to extend up to an additional 50 years",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b37ea37e-4b46-46b0-8e99-72bea128cb1c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.15,
        "x": 0.39,
        "y": 0.44
      },
      "kind": "table",
      "text": "PROJECT PROFILE\nStorage Capacity 4.1 Bcf\nFacility Cost $149M",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "127eee6b-d12b-4306-9b78-43de66ccd89b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.35,
        "x": 0.06,
        "y": 0.11
      },
      "kind": "title",
      "text": "NORTH MIST FACILITY",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8606b3d0-cb8b-45a6-9b38-a8ed4cc2fe4f",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Table data",
      "slug": "table-data",
      "agent": null,
      "layer": "slide",
      "matchId": "5f107da1-6b2a-4602-a59c-8c6aeb54205d",
      "evidence": "PROJECT PROFILE Storage Capacity 4.1 Bcf Facility Cost $149M",
      "confidence": 0.9
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}