{
  "docId": "019de50f-9b39-734c-b33c-547eca3c8723",
  "docSlug": "2e5b7daa68c5cf725e80ea0b2b96f00a",
  "documentTitle": "NuStar Energy | Investor Conference Presentation Deck | 47 slides",
  "authorId": "nustar-energy",
  "authorName": "NuStar Energy",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2020-03-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.3333334,
  "pageNumber": 23,
  "pageCount": 47,
  "prevPage": 22,
  "nextPage": 24,
  "slideType": "other",
  "function": "illustrate_case",
  "density": "overcrowded",
  "nDataPoints": 2,
  "notes": "Includes a map showing pipeline connections and storage capacity additions.",
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de50f-9b39-734c-b33c-547eca3c8723/23",
  "deckHref": "/decks/019de50f-9b39-734c-b33c-547eca3c8723",
  "deckJsonHref": "/decks/019de50f-9b39-734c-b33c-547eca3c8723.json",
  "deckAnchorHref": "/decks/019de50f-9b39-734c-b33c-547eca3c8723#slide-23",
  "components": [
    {
      "bbox": {
        "h": 0.55,
        "w": 0.63,
        "x": 0.35,
        "y": 0.27
      },
      "kind": "image",
      "text": "Map of South Texas pipeline infrastructure",
      "attrs": null,
      "subkind": "map",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8f6c5306-b468-44a7-befb-c6f17ca8a770",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.35,
        "x": 0.03,
        "y": 0.18
      },
      "kind": "list",
      "text": "We have completed our project for Trafigura to connect our existing South Texas Crude System with PAA’s Cactus II to transport Permian barrels to our Corpus Christi North Beach facility for export.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "7d240834-b28f-4e4a-8776-cb64f66c2bd0",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.85,
        "x": 0.06,
        "y": 0.88
      },
      "kind": "list",
      "text": "We are in discussions to connect to other long-haul pipeline projects and with parties for additional commitments",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8008016c-716e-461b-b274-7bd18b0d7e77",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.32,
        "x": 0.06,
        "y": 0.26
      },
      "kind": "list",
      "text": "In August, we began transporting WTI via our South Texas system 16” existing pipeline from a connection to PAA’s Cactus II pipeline to our Corpus Christi North Beach Terminal.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bf774160-f0f7-46c5-ba2e-807762ec0505",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.95,
        "x": 0.03,
        "y": 0.81
      },
      "kind": "list",
      "text": "Taft, TX will be the point of convergence for all three new pipelines and offers shipper optionality to deliver to either side of the ship channel (Ingleside or Corpus Christi)",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c8e4e8f3-a91e-4a9d-8a84-738c1f327aad",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.32,
        "x": 0.06,
        "y": 0.42
      },
      "kind": "list",
      "text": "In early September, we completed construction on a new 30” pipeline from a connection in Taft, TX to our Corpus Christi North Beach Terminal and continue to build 600Mbbls of storage at Corpus Christi, which will bring our capacity at the facility to 3.9MMbbls",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "eea13bf8-bb14-439f-8a33-7c31244c4b5e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.12,
        "w": 0.75,
        "x": 0.03,
        "y": 0.03
      },
      "kind": "title",
      "text": "We Have Expanded on Our Existing Assets in South Texas to Export Permian Barrels for Trafigura From Our Corpus Christi Facility",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5bb9bf96-c6dc-42d2-a7b7-f8abb3b59515",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Story Moments",
      "slug": "story-moments",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "21690937-b41e-4529-b994-088763cdf993",
      "evidence": "list/bullet: In early September, we completed construction on a new 30” pipeline from a connection in Taft, TX to our Corpus Christi North Beach Terminal and continue to build 600Mbbls of storage at Corpus Christi, which",
      "confidence": 0.7
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 47,
      "from": 21,
      "beatId": "70e1b1a6-c2d1-4241-87b7-e823959588c1",
      "arcName": "AIDA",
      "arcSlug": "aida",
      "beatName": "Action",
      "beatSlug": "aida-action",
      "evidence": "Encouraging investors to consider NuStar Energy's potential",
      "position": 3,
      "confidence": 0.8,
      "parentBeatName": "Resolution",
      "parentBeatSlug": "resolution"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}