  "documentTitle": "Antero Midstream Partners | Investor Conference Presentation Deck | 40 slides",
  "authorId": "antero-midstream-partners",
  "authorName": "Antero Resources",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2019-02-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.3314841,
  "pageNumber": 33,
  "pageCount": 40,
  "prevPage": 32,
  "nextPage": 34,
  "slideType": "before_after",
  "function": "present_solution",
  "density": "balanced",
  "nDataPoints": 9,
  "notes": "The chart uses a waterfall-bridge structure to explain cost variance.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de50f-4e66-7538-99b7-531a49dfe81b/33",
  "deckHref": "/decks/019de50f-4e66-7538-99b7-531a49dfe81b",
  "deckJsonHref": "/decks/019de50f-4e66-7538-99b7-531a49dfe81b.json",
  "deckAnchorHref": "/decks/019de50f-4e66-7538-99b7-531a49dfe81b#slide-33",
  "components": [
    {
      "bbox": {
        "h": 0.7,
        "w": 0.96,
        "x": 0.02,
        "y": 0.2
      },
      "kind": "chart",
      "text": "Antero Resources Stand-alone Marcellus Well Cost ($MM/1,000' assuming 12,000' Lateral)",
      "attrs": null,
      "subkind": "waterfall-bridge",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a7ceffb2-d1ab-4cc5-978b-65aa7824406f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.25,
        "x": 0.02,
        "y": 0.93
      },
      "kind": "subtitle",
      "text": "Note: Assumes 2,000 pound per foot completion.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "35445c45-7c50-48af-9d55-702e898a35fe",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.96,
        "x": 0.02,
        "y": 0.08
      },
      "kind": "title",
      "text": "Through negotiating contracts and self sourcing sand, Antero was able to mitigate a majority of inflationary pressures on D&C capital for 2019",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "2f6a0d48-433e-4e01-8947-e03fc38139ca",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.45,
        "x": 0.04,
        "y": 0.02
      },
      "kind": "title",
      "text": "Antero Resources D&C Capital",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5ce9ca6b-364b-42b0-b5ef-100687abe230",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Before-After-Bridge",
      "slug": "before-after-bridge",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "c91163ef-50d0-4739-956f-9b3d5c5e35b6",
      "evidence": "type: before_after with title/action-title: Through negotiating contracts and self sourcing sand, Antero was able to mitigate a majority of inflationary pressures on D&C capital for 2019",
      "confidence": 0.7
    },
    {
      "name": "Waterfall / value bridge",
      "slug": "waterfall-bridge",
      "agent": null,
      "layer": "slide",
      "matchId": "99690a44-6842-4509-a8fe-a3c55e117c0d",
      "evidence": "chart/waterfall-bridge: Antero Resources Stand-alone Marcellus Well Cost ($MM/1,000' assuming 12,000' Lateral)",
      "confidence": 0.8
    }
  ],
  "frameworks": [
    {
      "name": "waterfall-bridge",
      "slug": null,
      "matchId": "4145c061-e91b-4934-b716-45867545a25d",
      "evidence": "The slide uses a waterfall chart to bridge cost components from 2018 to 2019.",
      "confidence": 1
    }
  ],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}