{
  "docId": "019de50f-48bf-755a-8fd9-5626f9176e4d",
  "docSlug": "aacbb7456b8f2bfc0f4a33ec1f3e137b",
  "documentTitle": "Antero Midstream Partners | Mergers and Acquisitions Presentation Deck | 31 slides",
  "authorId": "antero-midstream-partners",
  "authorName": "Antero Midstream",
  "documentKindSlug": "deck",
  "documentKindLabel": "Deck",
  "sourceTypeSlug": "investment_bank",
  "sourceTypeLabel": "Investment bank",
  "presentationDate": "2019-01-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.3314841,
  "pageNumber": 28,
  "pageCount": 31,
  "prevPage": 27,
  "nextPage": 29,
  "slideType": "appendix_methodology",
  "function": "present_framework",
  "density": "dense",
  "nDataPoints": 0,
  "notes": "The slide defines maintenance capital as expenditures made to maintain long-term operating capacity or revenue.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de50f-48bf-755a-8fd9-5626f9176e4d/28",
  "deckHref": "/decks/019de50f-48bf-755a-8fd9-5626f9176e4d",
  "deckJsonHref": "/decks/019de50f-48bf-755a-8fd9-5626f9176e4d.json",
  "deckAnchorHref": "/decks/019de50f-48bf-755a-8fd9-5626f9176e4d#slide-28",
  "components": [
    {
      "bbox": {
        "h": 0.12,
        "w": 0.86,
        "x": 0.08,
        "y": 0.49
      },
      "kind": "callout",
      "text": "Maintenance capital expenditures are cash expenditures (including expenditures for the construction or development of new capital assets or the replacement, improvement or expansion of existing capital assets) made to maintain, over the long term, our operating capacity or revenue",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1848109d-a3af-4e94-b1dd-c04e8c0230e1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.28,
        "w": 0.88,
        "x": 0.06,
        "y": 0.65
      },
      "kind": "chart",
      "text": "Illustrative Example showing LTM Production, NTM Production Forecast, and Average LTM Production.",
      "attrs": null,
      "subkind": "line",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a510ceb3-9789-41b5-8ac2-c0b4031c1504",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.9,
        "x": 0.06,
        "y": 0.32
      },
      "kind": "list",
      "text": "Maintenance Capital Calculation Methodology – Fresh Water Distribution: Estimate wells for fresh water to maintain throughput; compare to total new wells; designate percentage of capital expenditures as maintenance.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3b5073b2-2fe6-405d-b34c-add7cc9c9b56",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.9,
        "x": 0.06,
        "y": 0.12
      },
      "kind": "list",
      "text": "Maintenance Capital Calculation Methodology – Low Pressure Gathering: Estimate new well connections to offset decline; compare to total connections; designate percentage of capital expenditures as maintenance.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "603a908f-9974-4b4b-acad-574e1781bc5e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.6,
        "x": 0.06,
        "y": 0.02
      },
      "kind": "title",
      "text": "Maintenance Capital Methodology",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ae73bf7b-8976-4c9a-990d-1fe9541f8e64",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Analytical method",
      "slug": "analytical-method",
      "agent": null,
      "layer": "slide",
      "matchId": "b371f87c-b584-4815-8494-a859b936fe49",
      "evidence": "list/bullet: Maintenance Capital Calculation Methodology – Fresh Water Distribution and list/bullet: Maintenance Capital Calculation Methodology – Low Pressure Gathering",
      "confidence": 0.7
    }
  ],
  "frameworks": [
    {
      "name": "analytical-method",
      "slug": null,
      "matchId": "073abea9-111e-48e6-95ed-44a5c648d545",
      "evidence": "The slide details a specific calculation methodology for maintenance capital.",
      "confidence": 0.8
    }
  ],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}