{
  "docId": "019de077-0df8-7270-b2db-1a6b54913721",
  "docSlug": "b2630e48248ebd6f3de5726a15d13989",
  "documentTitle": "Lion Electric | Investor Presentation Deck | 32 slides",
  "authorId": "lion-electric",
  "authorName": "Lion Electric",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2024-03-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 11,
  "pageCount": 32,
  "prevPage": 10,
  "nextPage": 12,
  "slideType": "other",
  "function": "present_solution",
  "density": "overcrowded",
  "nDataPoints": 2,
  "notes": "Includes images of the facility exterior, battery pack, and production floor.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de077-0df8-7270-b2db-1a6b54913721/11",
  "deckHref": "/decks/019de077-0df8-7270-b2db-1a6b54913721",
  "deckJsonHref": "/decks/019de077-0df8-7270-b2db-1a6b54913721.json",
  "deckAnchorHref": "/decks/019de077-0df8-7270-b2db-1a6b54913721#slide-11",
  "components": [
    {
      "bbox": {
        "h": 0.08,
        "w": 0.8,
        "x": 0.02,
        "y": 0.89
      },
      "kind": "disclaimer",
      "text": "1) While Lion's manufacturing facilities currently have the infrastructures in place to achieve an annual production capacity of up to 2,500 vehicles at the St-Jerome facility, up to 2,500 buses at the Joliet facility and up to 1.7 GWh at the Battery Plant, the Company has not produced at such levels to date. See section 2 of the Company's Annual Information Form entitled \"Caution Regarding Forward-Looking Statements\" and section 23.0 of the Company's fiscal 2023 MD&A entitled \"Risk Factors.\"\n2) Capex figures include R&D / addition to intangible assets",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "20fdd8d0-ecb7-44eb-9188-f54568e7c43d",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.34,
        "w": 0.36,
        "x": 0.64,
        "y": 0
      },
      "kind": "image",
      "text": "Exterior of Lion Campus",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "02bcff71-dd26-4d79-bea3-8fb5e9f4ddf0",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.28,
        "w": 0.36,
        "x": 0.64,
        "y": 0.36
      },
      "kind": "image",
      "text": "Battery pack and production line",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e4d3206d-14de-4828-ab43-7b08a6cb2083",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.28,
        "w": 0.36,
        "x": 0.64,
        "y": 0.65
      },
      "kind": "image",
      "text": "Interior of manufacturing facility",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e76745fd-2bee-4a11-8eb4-2293aee39f1a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.58,
        "x": 0.02,
        "y": 0.18
      },
      "kind": "list",
      "text": "Highly-automated battery plant and Innovation Center, located in Mirabel, near existing manufacturing footprint\nInfrastructure in place, including the production line and equipment, to achieve a production capacity of up to 1.7 GWh on an annual basis\nFinal certification of LionMD battery packs in Q4 2023\nContinued to ramp-up production of Lion battery packs and activities to integrate Lion battery pack technology into vehicles\nTotal cost of the project of ~$125M",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e85bb289-c520-4df5-854d-0b479270879e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.5,
        "x": 0.02,
        "y": 0.64
      },
      "kind": "list",
      "text": "Projected Cost Savings Through Further Vertical Integration\nFlexibility to Adapt to Emerging Battery Technologies\nIncreasing Supply Alternatives\nControl Over Battery Design to Optimize Specifications",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f840ed1d-5861-4cca-816d-7c273c1c2b60",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.5,
        "x": 0.02,
        "y": 0.04
      },
      "kind": "title",
      "text": "Lion Campus - Battery Plant and Innovation Center",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1c9f614c-a36d-4094-bbfc-43cbd3f9b132",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.1,
        "x": 0.02,
        "y": 0.58
      },
      "kind": "title",
      "text": "Rationale",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ee5397cb-a8ac-47ff-9520-fe881a5e0b2f",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 11,
      "from": 6,
      "beatId": "388b59da-8fce-4c8c-a653-ab70b31a2316",
      "arcName": "The Sequoia Pitch",
      "arcSlug": "sequoia-pitch",
      "beatName": "Product",
      "beatSlug": "sequoia-pitch-product",
      "evidence": "The presentation showcases Lion Electric's product lineup and manufacturing capabilities",
      "position": 2,
      "confidence": 0.8,
      "parentBeatName": "Evidence",
      "parentBeatSlug": "evidence"
    }
  ],
  "loops": [
    {
      "to": 20,
      "from": 3,
      "name": "Quick Win Big Bet",
      "slug": "47-quick-win-big-bet",
      "bestFor": "Transformation planning, 100-day plans, resource allocation",
      "matchId": "9b0afd25-2e28-43ac-b814-e9c77943227d",
      "evidence": "The presentation provides an overview of Lion Electric's growth plans and financial performance",
      "position": 1,
      "objective": "The potential for significant returns on investment in Lion Electric",
      "structure": "The Full List -> Quick Wins (Low effort, High impact) -> Big Bets (High effort, High impact) -> Sequenced Roadmap",
      "confidence": 0.6,
      "description": "Separate initiatives into immediate wins and longer-term strategic bets"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}