  "docId": "019de076-82b3-71fc-a083-11d5b5ccf131",
  "docSlug": "11116b7284a1760259ec8bac2763082b",
  "documentTitle": "Lion Electric | Investor Presentation Deck | 31 slides",
  "authorId": "lion-electric",
  "authorName": "Lion Electric",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-12-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 11,
  "pageCount": 31,
  "prevPage": 10,
  "nextPage": 12,
  "slideType": "other",
  "function": "present_solution",
  "density": "overcrowded",
  "nDataPoints": 5,
  "notes": "The slide combines facility status, strategic benefits, and financial updates.",
  "elementsJson": null,
  "metadataConfidence": 0.95,
  "imagePath": null,
  "slideHref": "/slides/019de076-82b3-71fc-a083-11d5b5ccf131/11",
  "deckHref": "/decks/019de076-82b3-71fc-a083-11d5b5ccf131",
  "deckJsonHref": "/decks/019de076-82b3-71fc-a083-11d5b5ccf131.json",
  "deckAnchorHref": "/decks/019de076-82b3-71fc-a083-11d5b5ccf131#slide-11",
  "components": [
    {
      "bbox": {
        "h": 0.04,
        "w": 0.1,
        "x": 0.03,
        "y": 0.475
      },
      "kind": "callout",
      "text": "Rationale",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "097f05d9-ff87-41de-86b8-ab7cb2663afc",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.82,
        "w": 0.38,
        "x": 0.62,
        "y": 0
      },
      "kind": "image",
      "text": "Facility photos",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "326199ed-33f7-44cd-a8db-fba1d150b7e6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.55,
        "x": 0.03,
        "y": 0.13
      },
      "kind": "list",
      "text": "Highly-automated battery plant and Innovation Center, located in Mirabel, near existing manufacturing footprint. Equipment currently in place for annual production capacity of 1.7 GWh (enough to power ~5,000 vehicles) and estimated maximum annual capacity of 5GWh at full scale. Final certification of Lion battery packs in Q4 2023. Continued to ramp-up production of Lion battery packs and activities to integrate Lion battery pack technology into vehicles. Completed shell of the Innovation Center, which is used as a testing & certification center, a pre-delivery inspection site and a warehouse for inventory. It will soon be used as a showroom, delivery center, for customers to see and test vehicles on test track.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4043e466-40e5-44e8-9f12-789df16fc596",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.5,
        "x": 0.03,
        "y": 0.53
      },
      "kind": "list",
      "text": "Projected Cost Savings Through Further Vertical Integration. Flexibility to Adapt to Emerging Battery Technologies. Increasing Supply Alternatives. Control Over Battery Design to Optimize Specifications.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b77e014f-b341-45df-b28a-77dc556296d5",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.55,
        "x": 0.03,
        "y": 0.76
      },
      "kind": "list",
      "text": "Incurred ~$10M in Q3 2023. Total capex incurred to date of ~$116M. Expected capex of ~$7M for the remainder of 2023, which will be the end of main initial investments",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d14eb0d9-7a02-4bad-a941-7ddcffd50ced",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.6,
        "x": 0.03,
        "y": 0.94
      },
      "kind": "source-note",
      "text": "1) Management's expectations with respect to the LionCampus and the related ramp-up of production are based on a number of assumptions and may be subject to change. See \"Forward-Looking Statements\" on page 1. 2) Capex figures include R&D / addition to intangible assets",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8437d618-7e3b-4b28-b3ee-f20f69b6e3b0",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.2,
        "x": 0.03,
        "y": 0.71
      },
      "kind": "title",
      "text": "Project Cost Update(2)",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "7308aa02-0b91-46a1-87e6-7c4f15568c58",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.5,
        "x": 0.03,
        "y": 0.04
      },
      "kind": "title",
      "text": "Lion Campus - Battery Plant and Innovation Center",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ae42d5b2-ced0-4692-bb95-e4d2b6a62609",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Audience Definition",
      "slug": "audience-definition",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "bce53555-17f0-4009-bcb6-a42615afe076",
      "evidence": "Lion Campus - Battery Plant and Innovation Center",
      "confidence": 0.5
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [
    {
      "to": 20,
      "from": 3,
      "name": "Quick Win Big Bet",
      "slug": "47-quick-win-big-bet",
      "bestFor": "Transformation planning, 100-day plans, resource allocation",
      "matchId": "c16c570c-c489-4998-8975-ff2c9f0cfbe8",
      "evidence": "The presentation aims to showcase Lion Electric's potential for growth and returns, with a clear call to action for investors.",
      "position": 1,
      "objective": "To present Lion Electric as a company with significant growth potential and a clear path to success",
      "structure": "The Full List -> Quick Wins (Low effort, High impact) -> Big Bets (High effort, High impact) -> Sequenced Roadmap",
      "confidence": 0.6,
      "description": "Separate initiatives into immediate wins and longer-term strategic bets"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}