{
  "docId": "019de076-82b3-71fc-a083-11d5b5ccf131",
  "docSlug": "11116b7284a1760259ec8bac2763082b",
  "documentTitle": "Lion Electric | Investor Presentation Deck | 31 slides",
  "authorId": "lion-electric",
  "authorName": "Lion Electric",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-12-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 10,
  "pageCount": 31,
  "prevPage": 9,
  "nextPage": 11,
  "slideType": "context",
  "function": "establish_context",
  "density": "overcrowded",
  "nDataPoints": 5,
  "notes": "Includes forward-looking statement disclaimer in footer.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de076-82b3-71fc-a083-11d5b5ccf131/10",
  "deckHref": "/decks/019de076-82b3-71fc-a083-11d5b5ccf131",
  "deckJsonHref": "/decks/019de076-82b3-71fc-a083-11d5b5ccf131.json",
  "deckAnchorHref": "/decks/019de076-82b3-71fc-a083-11d5b5ccf131#slide-10",
  "components": [
    {
      "bbox": {
        "h": 0.04,
        "w": 0.18,
        "x": 0.03,
        "y": 0.67
      },
      "kind": "callout",
      "text": "Project Cost Update",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "17817117-cd5a-408e-8551-edde3dd535e1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.1,
        "x": 0.03,
        "y": 0.43
      },
      "kind": "callout",
      "text": "Rationale",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "40254dc0-5f5d-4bff-a940-6e6045b53b69",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.42,
        "w": 0.42,
        "x": 0.55,
        "y": 0.48
      },
      "kind": "image",
      "text": "Manufacturing facility interior",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "70464de4-74df-45b8-bd9e-bde19d3a2f44",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.42,
        "w": 0.42,
        "x": 0.55,
        "y": 0.05
      },
      "kind": "image",
      "text": "Lion Electric bus exterior",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "837c140b-5d97-4e63-b031-5deb32b4046e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.48,
        "x": 0.03,
        "y": 0.15
      },
      "kind": "list",
      "text": "900K ft² facility with infrastructure in place to reach annual production capacity of 2,500 school buses and expected capacity of 20K vehicles per annum, at full scale(1)\nCompleted building and tenant improvements\nContinued to ramp-up production of LionC\nStarted commercial production of LionD",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "390b2843-a475-40ec-b24d-69593e368d2f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.48,
        "x": 0.03,
        "y": 0.72
      },
      "kind": "list",
      "text": "Incurred ~$4M in Q3 2023\nTotal project capex incurred to date of ~$100M\nExpected capex of $5M for the remainder of 2023, which will be the end of main initial investments",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "501e0712-f9e4-417f-81dd-9892a48adb38",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.45,
        "x": 0.03,
        "y": 0.48
      },
      "kind": "list",
      "text": "Closer Proximity to Largest Portion of North American TAM\nProximity to Larger Pool of Suppliers\n\"Made in America\" Manufacturing\n\"Made in America\" Branding",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "81fafd3d-2b39-4b6f-92ff-6bffc40ec1e8",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.55,
        "x": 0.03,
        "y": 0.94
      },
      "kind": "source-note",
      "text": "1) Management's expectations with respect to the Joliet Manufacturing Facility and the related ramp-up of production are based on a number of assumptions and may be subject to change. See \"Forward-Looking Statements\" on page 1.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a51a2caf-3563-4377-b3b2-6f519c1efb15",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.45,
        "x": 0.03,
        "y": 0.04
      },
      "kind": "title",
      "text": "Existing Manufacturing Footprint in Joliet (U.S.)",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e6a7fdf1-2374-44c8-974d-ecf103fc259d",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Before-After-Bridge",
      "slug": "before-after-bridge",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "4c09759d-8a95-4876-9ef1-117412a9f163",
      "evidence": "Closer Proximity to Largest Portion of North American TAM",
      "confidence": 0.5
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [
    {
      "to": 20,
      "from": 3,
      "name": "Quick Win Big Bet",
      "slug": "47-quick-win-big-bet",
      "bestFor": "Transformation planning, 100-day plans, resource allocation",
      "matchId": "c16c570c-c489-4998-8975-ff2c9f0cfbe8",
      "evidence": "The presentation aims to showcase Lion Electric's potential for growth and returns, with a clear call to action for investors.",
      "position": 1,
      "objective": "To present Lion Electric as a company with significant growth potential and a clear path to success",
      "structure": "The Full List -> Quick Wins (Low effort, High impact) -> Big Bets (High effort, High impact) -> Sequenced Roadmap",
      "confidence": 0.6,
      "description": "Separate initiatives into immediate wins and longer-term strategic bets"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}