  "docId": "019de076-3d0a-7376-9238-063a1087922f",
  "docSlug": "583a95f9802c6bfe683a4551ef315e17",
  "documentTitle": "Freyr | Results Presentation Deck | 14 slides",
  "authorId": "freyr",
  "authorName": "FREYR",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-11-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 6,
  "pageCount": 14,
  "prevPage": 5,
  "nextPage": 7,
  "slideType": "key_messages",
  "function": "diagnose_problem",
  "density": "dense",
  "nDataPoints": 0,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de076-3d0a-7376-9238-063a1087922f/6",
  "deckHref": "/decks/019de076-3d0a-7376-9238-063a1087922f",
  "deckJsonHref": "/decks/019de076-3d0a-7376-9238-063a1087922f.json",
  "deckAnchorHref": "/decks/019de076-3d0a-7376-9238-063a1087922f#slide-6",
  "components": [
    {
      "bbox": {
        "h": 0.5,
        "w": 0.3,
        "x": 0.68,
        "y": 0.265
      },
      "kind": "list",
      "text": "IMPLEMENTING PLAN TO PREVENT FURTHER DELAYS: Applying One Plan and One Team approach; Enhanced involvement of technology and battery subject matter experts; Increased coordination and day-to-day involvement with vendors and partners; FREYR has established a dedicated Technology Advisory Board consisting of subject matter experts",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "51cb5515-d567-4595-9701-d8f32a45a7ae",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.5,
        "w": 0.3,
        "x": 0.35,
        "y": 0.265
      },
      "kind": "list",
      "text": "WHAT'S CHANGED AND WHAT WE'VE LEARNED: Completion of commissioning has proven to be more difficult than we originally thought; High complexity of commissioning Casting & Unit Cell Assembly equipment; Problem solving during commissioning process continues to reveal difficult but surmountable engineering and scaling challenges",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b2e6b078-e6dc-4848-b813-9dd5a9a42184",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.5,
        "w": 0.3,
        "x": 0.02,
        "y": 0.265
      },
      "kind": "list",
      "text": "CURRENT STATUS: The timeline to complete commissioning has pushed beyond 4Q 2023; FREYR announced two key technical milestones at the CQP during 3Q 2023; Introduction of automated casting with live electrolyte in dry room environment and commissioning and testing of merge unit have not been completed; Continuing to identify and address tasks on critical path",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bac93157-14a7-4800-b49c-fb2df6cd3b65",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.12,
        "w": 0.28,
        "x": 0.03,
        "y": 0.05
      },
      "kind": "title",
      "text": "CQP UPDATE",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "98980979-fde2-4d7e-a374-adf36aba19a8",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "28c72b0d-e8f2-4b9f-ba84-bde27efdc6fc",
      "evidence": "list/bullet: CURRENT STATUS: The timeline to complete commissioning has pushed beyond 4Q 2023; FREYR announced two key technical milestones at the CQP during 3Q 2023; Introduction of automated casting with live electroly",
      "confidence": 0.9
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 9,
      "from": 6,
      "beatId": "b5c77ba9-e981-4a7a-9df7-efdd8de5fc20",
      "arcName": "The Sequoia Pitch",
      "arcSlug": "sequoia-pitch",
      "beatName": "Solution",
      "beatSlug": "sequoia-pitch-solution",
      "evidence": "The CQP update and technology diversification strategy sections present a solution to the problem outlined earlier.",
      "position": 1,
      "confidence": 0.7,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}