{
  "docId": "019de074-9148-7009-bb40-cb3dc3537654",
  "docSlug": "0c20e89884f354688796ef1a100b1718",
  "documentTitle": "Lion Electric | Investor Presentation Deck | 33 slides",
  "authorId": "lion-electric",
  "authorName": "Lion Electric",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-03-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7744917,
  "pageNumber": 11,
  "pageCount": 33,
  "prevPage": 10,
  "nextPage": 12,
  "slideType": "context",
  "function": "establish_context",
  "density": "overcrowded",
  "nDataPoints": 6,
  "notes": "Includes footnotes regarding forward-looking statements and capex definitions.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de074-9148-7009-bb40-cb3dc3537654/11",
  "deckHref": "/decks/019de074-9148-7009-bb40-cb3dc3537654",
  "deckJsonHref": "/decks/019de074-9148-7009-bb40-cb3dc3537654.json",
  "deckAnchorHref": "/decks/019de074-9148-7009-bb40-cb3dc3537654#slide-11",
  "components": [
    {
      "bbox": {
        "h": 0.04,
        "w": 0.5,
        "x": 0.02,
        "y": 0.0048
      },
      "kind": "callout",
      "text": "RATIONALE",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6249fa36-870b-4904-b4ff-d0ff1929cc4b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.5,
        "x": 0.02,
        "y": 0.006900000000000001
      },
      "kind": "callout",
      "text": "PROJECT COST UPDATE",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "98cef1d0-a92c-46c9-bf2a-abdb7d3a67ed",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.95,
        "x": 0.02,
        "y": 0.0091
      },
      "kind": "disclaimer",
      "text": "1) Represents management's estimates... 2) The cadence of the Company's investments... 3) Capex figures includes R&D / addition to intangible assets",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "60ee6b06-d6cc-411f-a337-d019df95e9a1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.75,
        "w": 0.4,
        "x": 0.0056,
        "y": 0.15
      },
      "kind": "image",
      "text": null,
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "872c42c6-2a7f-450a-9e6f-ef0351504982",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.5,
        "x": 0.02,
        "y": 0.0016
      },
      "kind": "list",
      "text": "Lion Campus consists of a highly-automated battery plant and an Innovation Center, located in Mirabel, near existing manufacturing footprint. Final certification expected in first half of 2023, followed by gradual ramp up of production in 2023. Estimated maximum annual capacity of battery plant to amount to 5GWh at full scale. Expect annual production capacity of 1.7 GWh by year-end 2023. Completed production of the first battery pack in Q4 2022. Final certification of first battery pack model.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "14d128b0-1924-4c80-91cd-e83acea65231",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.5,
        "x": 0.02,
        "y": 0.0074
      },
      "kind": "list",
      "text": "Total capex incurred to date of ~$78M. Expected capex of ~$45M in 2023; ~$23M for battery plant and ~$22M for Innovation Center.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3b20145a-3ac5-4917-85e0-34ed865ed586",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.5,
        "x": 0.02,
        "y": 0.0052
      },
      "kind": "list",
      "text": "Projected Cost Savings Through Further Vertical Integration. Increasing Supply Alternatives. Flexibility to Adapt to Emerging Battery Technologies. Control Over Battery Design to Optimize Specifications.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f6538c11-41da-4241-b550-7cc4d90219e4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.5,
        "x": 0.02,
        "y": 0.04
      },
      "kind": "title",
      "text": "Lion Campus - Battery Plant and Innovation Center",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "11ba9477-b534-49e8-8d8d-be42d8df3164",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Audience frame",
      "slug": "audience-frame",
      "agent": null,
      "layer": "slide",
      "matchId": "b323ac87-cd0c-4df1-8dcd-39d664ba0f72",
      "evidence": "The slide provides context about the Lion Campus and its benefits, which may help frame the audience's understanding of the company's strategy.",
      "confidence": 0.5
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}