{
  "docId": "019de073-9807-709e-a6cc-853744519022",
  "docSlug": "8a753420819718dd1e00d12a557903a8",
  "documentTitle": "SkyHarbour | Investor Presentation Deck | 8 slides",
  "authorId": "skyharbour",
  "authorName": "SkyHarbour",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2022-09-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 4,
  "pageCount": 8,
  "prevPage": 3,
  "nextPage": 5,
  "slideType": "other",
  "function": "analyze_data",
  "density": "dense",
  "nDataPoints": 3,
  "notes": "The slide outlines a financial challenge (funding gap) and specific operational strategies to address it.",
  "elementsJson": null,
  "metadataConfidence": 0.95,
  "imagePath": null,
  "slideHref": "/slides/019de073-9807-709e-a6cc-853744519022/4",
  "deckHref": "/decks/019de073-9807-709e-a6cc-853744519022",
  "deckJsonHref": "/decks/019de073-9807-709e-a6cc-853744519022.json",
  "deckAnchorHref": "/decks/019de073-9807-709e-a6cc-853744519022#slide-4",
  "components": [
    {
      "bbox": {
        "h": 0.45,
        "w": 0.9,
        "x": 0.05,
        "y": 0.4
      },
      "kind": "list",
      "text": "Cost mitigation efforts:\nVertical integration with a national PEMB manufacturer\nSupplies both building and door, resulting in lower total construction time, reduced construction costs, and a better functioning, more reliable product\nGMP contracts with buyout and shared savings provisions to align GC and owner incentives\nNational purchasing of floor epoxy, lighting, and other materials\nPilot program for \"roving\" GC at APA for use at future fields\nIncreasing land use efficiency by maximizing rentable square footage while optimizing amount of ramp and other non-rentable areas",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "085d2d53-9ec4-4188-b49e-1980e3a6f3c1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.9,
        "x": 0.05,
        "y": 0.18
      },
      "kind": "list",
      "text": "With execution of APA 1 and DVT 1 GMPs, ~57% of estimated aggregate Project budget is completed or under contract\nInflation in both labor and materials have increased construction costs above underwritten estimates at the time of the Private Activity Bond issuance in 2021\nEstimated funding gap of $37-67mm ($55mm midpoint) at remaining construction in the Obligated Group",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1c6475ac-e791-4646-bbed-bf485c6cb7ef",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.5,
        "x": 0.05,
        "y": 0.9
      },
      "kind": "source-note",
      "text": "Assumes current cost increases at APA and DVT apply at other phases not under GMP contracts",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c8eafd2d-f2b0-40e4-b90a-881540bd8665",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.6,
        "x": 0.05,
        "y": 0.08
      },
      "kind": "title",
      "text": "Construction Cost Update and Cost Mitigation Factors",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ec495945-5959-4f9b-b868-e7663674c173",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "5fac4b00-0c41-470c-826e-e624cc9c72b3",
      "evidence": "list/bullet: Cost mitigation efforts:",
      "confidence": 0.9
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 4,
      "from": 3,
      "beatId": "2b39992e-57ce-491d-8261-3003b01b0b47",
      "arcName": "Problem-Agitate-Solution",
      "arcSlug": "problem-agitate-solution",
      "beatName": "Problem",
      "beatSlug": "problem-agitate-solution-problem-identify-pain",
      "evidence": "Slides 3-4 present the current project status and construction cost update",
      "position": 0,
      "confidence": 0.8,
      "parentBeatName": "Complication",
      "parentBeatSlug": "complication"
    },
    {
      "to": 5,
      "from": 4,
      "beatId": "6cc8cc0a-46c6-41e4-b915-7560c1f9b99c",
      "arcName": "Problem-Agitate-Solution",
      "arcSlug": "problem-agitate-solution",
      "beatName": "Agitate",
      "beatSlug": "problem-agitate-solution-agitate-make-it-worse",
      "evidence": "Slides 4-5 highlight the complications and potential shortfall",
      "position": 1,
      "confidence": 0.8,
      "parentBeatName": "Development",
      "parentBeatSlug": "development"
    }
  ],
  "loops": [
    {
      "to": 6,
      "from": 4,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "b04e0117-2d84-41ae-b0fe-ce435e1507c7",
      "evidence": "The deck implies the consequences of inaction through the presentation of a capitalization plan",
      "position": 0,
      "objective": "What are the consequences of not addressing the shortfall?",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.7,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}