{
  "docId": "019de072-2ed4-76c9-851d-a624cd3f4ec4",
  "docSlug": "ca85817ec89a66166530478024b90495",
  "documentTitle": "Kalera | SPAC Presentation Deck | 50 slides",
  "authorId": "kalera",
  "authorName": "Kalera",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investment_bank",
  "sourceTypeLabel": "Investment bank",
  "presentationDate": "2022-02-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 49,
  "pageCount": 50,
  "prevPage": 48,
  "nextPage": 50,
  "slideType": "context",
  "function": "establish_context",
  "density": "overcrowded",
  "nDataPoints": 1,
  "notes": "The slide explains a strategic shift in infrastructure investment, moving away from a legacy site to a new, optimized facility.",
  "elementsJson": null,
  "metadataConfidence": 0.95,
  "imagePath": null,
  "slideHref": "/slides/019de072-2ed4-76c9-851d-a624cd3f4ec4/49",
  "deckHref": "/decks/019de072-2ed4-76c9-851d-a624cd3f4ec4",
  "deckJsonHref": "/decks/019de072-2ed4-76c9-851d-a624cd3f4ec4.json",
  "deckAnchorHref": "/decks/019de072-2ed4-76c9-851d-a624cd3f4ec4#slide-49",
  "components": [
    {
      "bbox": {
        "h": 0.63,
        "w": 0.35,
        "x": 0.62,
        "y": 0.27
      },
      "kind": "image",
      "text": null,
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "30f2b4a0-dbc1-4ef0-94eb-805c165ddf84",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.55,
        "x": 0.03,
        "y": 0.5
      },
      "kind": "list",
      "text": "In spite of challenges related to Orlando Facility (Kalera’s first prototype Large-Scale facility), significant learnings from operating Kalera’s first facility led to design improvements deployed in Atlanta, Houston, Denver and facilities currently under construction",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "48ca41b2-46fc-4f9a-b158-b4df8602c342",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.55,
        "x": 0.03,
        "y": 0.35
      },
      "kind": "list",
      "text": "Physical plant and power limitations prevent the Orlando Facility from receiving necessary upgrades. Limiting facility utilization(1) to ~60% of maximum production capacity(1). As a result, facility will not achieve financial targets",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d09af9f9-17f2-446d-8ee3-97505f041d1e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.55,
        "x": 0.03,
        "y": 0.65
      },
      "kind": "list",
      "text": "Sales growth in Orlando will continue while supported by the Atlanta facility. Florida market has huge potential that can only be served by a fully integrated farm leveraging automation and production capabilities to grow cut leaf, baby leaf, full heads and microgreens",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f793d496-405a-43d9-83ca-4026c5ca3a8f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.55,
        "x": 0.03,
        "y": 0.8
      },
      "kind": "list",
      "text": "New facility planned for Central Florida market and current Orlando facility will be repurposed after commissioning of new farm",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "feca9a62-4852-4a42-bc36-0fa49aac0133",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.5,
        "x": 0.03,
        "y": 0.92
      },
      "kind": "source-note",
      "text": "Source: Company information. 1) Production Capacity / Utilization is the percentage of total facility capacity currently utilized to grow plants in a given time period.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6fa53ca4-001a-4716-b8ff-76ca641f1477",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.7,
        "x": 0.03,
        "y": 0.22
      },
      "kind": "title",
      "text": "Kalera’s first large-scale facility prototype will not go through previously announced retrofit in 2022",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9666802b-a8d4-41f6-a4db-c7b65264f5df",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.85,
        "x": 0.03,
        "y": 0.07
      },
      "kind": "title",
      "text": "New Facility Planned for Central Florida Market to Meet Growing Sales Demand",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c6ed6a39-02f5-4c2a-9f7c-13a7254df84b",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [],
  "loops": [
    {
      "to": 49,
      "from": 48,
      "name": "Quick Win Big Bet",
      "slug": "47-quick-win-big-bet",
      "bestFor": "Transformation planning, 100-day plans, resource allocation",
      "matchId": "215c7d62-504b-46e2-bfb8-ac30414238d7",
      "evidence": "Farm of the Future Leveraging All Kalera’s Latest IP & Technology Coming in 1st Half 2023",
      "position": 2,
      "objective": "What are the plans for future growth?",
      "structure": "The Full List -> Quick Wins (Low effort, High impact) -> Big Bets (High effort, High impact) -> Sequenced Roadmap",
      "confidence": 0.5,
      "description": "Separate initiatives into immediate wins and longer-term strategic bets"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}