  "docId": "019de072-2ed4-76c9-851d-a624cd3f4ec4",
  "docSlug": "ca85817ec89a66166530478024b90495",
  "documentTitle": "Kalera | SPAC Presentation Deck | 50 slides",
  "authorId": "kalera",
  "authorName": "Kalera",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investment_bank",
  "sourceTypeLabel": "Investment bank",
  "presentationDate": "2022-02-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 42,
  "pageCount": 50,
  "prevPage": 41,
  "nextPage": 43,
  "slideType": "context",
  "function": "establish_context",
  "density": "dense",
  "nDataPoints": 18,
  "notes": "The slide uses a dual-axis line chart to show the convergence of production capacity and throughput yield over a 10-month period.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de072-2ed4-76c9-851d-a624cd3f4ec4/42",
  "deckHref": "/decks/019de072-2ed4-76c9-851d-a624cd3f4ec4",
  "deckJsonHref": "/decks/019de072-2ed4-76c9-851d-a624cd3f4ec4.json",
  "deckAnchorHref": "/decks/019de072-2ed4-76c9-851d-a624cd3f4ec4#slide-42",
  "components": [
    {
      "bbox": {
        "h": 0.07,
        "w": 0.17,
        "x": 0.46,
        "y": 0.27
      },
      "kind": "callout",
      "text": "Production capacity (1) aligned to sales demand",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "dac0f3ca-5e9f-4b07-8f37-df4a67e0eaef",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.65,
        "w": 0.65,
        "x": 0.04,
        "y": 0.22
      },
      "kind": "chart",
      "text": "Kalera Large-Scale Facility Commissioning Process for Facilities Opened in 2021-2022",
      "attrs": null,
      "subkind": "line",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "239c6f44-408c-4a08-9f04-59bcb7561b1e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.26,
        "x": 0.71,
        "y": 0.27
      },
      "kind": "list",
      "text": "10-month process to test and balance all systems begins at first harvest; Operational losses due to ramp-up are expected until sales demand is aligned with production capacity; Currently align production with sales at month 10; Production data cannot be used to project sales during the 10-month commissioning process",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4537110b-783f-4f2e-a78c-4c80f7802cd7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.65,
        "x": 0.04,
        "y": 0.88
      },
      "kind": "source-note",
      "text": "Source: Company information. 1) Production Capacity is the percentage of total facility capacity currently utilized to grow plants in a given time period. 2) Maximum Capacity is the facility yield capacity if all available production systems for growing plants are 100% stabilized. 3) Throughput yield is the percent of production capacity of plants that meets or exceeds quality standards and are ready for sale.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "42830dd9-d3e1-4360-baaa-aad7e2759942",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.12,
        "w": 0.65,
        "x": 0.03,
        "y": 0.06
      },
      "kind": "title",
      "text": "Current 10-month Facility Production Ramp-up Model to Test and Balance All Systems",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d7145896-cc56-4fea-9954-a00a4cfc5f9e",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "3282e0c3-fb0c-48fb-98fb-ce57d0873318",
      "evidence": "list/bullet: 10-month process to test and balance all systems begins at first harvest; Operational losses due to ramp-up are expected until sales demand is aligned with production capacity; ",
      "confidence": 0.7
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}