{
  "docId": "019de072-2c9b-776b-bcac-392c76bd36e0",
  "docSlug": "67e577d2019540acec6e3fd823908ae9",
  "documentTitle": "HSBC | Results Presentation Deck | 58 slides",
  "authorId": "hsbc",
  "authorName": "HSBC",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2022-02-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 18,
  "pageCount": 58,
  "prevPage": 17,
  "nextPage": 19,
  "slideType": "kpi_overview",
  "function": "analyze_data",
  "density": "dense",
  "nDataPoints": 10,
  "notes": "The slide uses a waterfall chart to explain cost variance between 2019 and 2021, and a callout box to summarize future cost targets.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de072-2c9b-776b-bcac-392c76bd36e0/18",
  "deckHref": "/decks/019de072-2c9b-776b-bcac-392c76bd36e0",
  "deckJsonHref": "/decks/019de072-2c9b-776b-bcac-392c76bd36e0.json",
  "deckAnchorHref": "/decks/019de072-2c9b-776b-bcac-392c76bd36e0#slide-18",
  "components": [
    {
      "bbox": {
        "h": 0.55,
        "w": 0.29,
        "x": 0.68,
        "y": 0.32
      },
      "kind": "callout",
      "text": "Stable costs over FY22. Targeting FY22 adjusted costs in line with FY21. We intend to manage cost growth within a 0 – 2% range in FY23, mitigating inflation with cost saves.",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "13b83168-4efc-4d68-aeb7-f400071be68f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.4,
        "w": 0.65,
        "x": 0.03,
        "y": 0.225
      },
      "kind": "chart",
      "text": "Adjusted costs, $bn",
      "attrs": null,
      "subkind": "waterfall-bridge",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0459e0f8-6a8a-4bd3-81fd-a17a985814f2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.6,
        "x": 0.03,
        "y": 0.7
      },
      "kind": "list",
      "text": "Programme cost saves to date of $3.3bn and associated CTA spend of $3.6bn; c.60% completion of announced cost programme. Technology spend of $6.0bn, up 6% vs. FY20. Expect CTA spend of c.$3.4bn over FY22, expected to generate >$2bn of cost saves.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c337f870-3f93-4e42-b80c-dde1f6357e70",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.33,
        "x": 0.03,
        "y": 0.11
      },
      "kind": "title",
      "text": "Cost programme progress",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9e179c2c-c6ca-48a3-b203-163ba929c9b5",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Waterfall chart",
      "slug": "waterfall-chart",
      "agent": null,
      "layer": "slide",
      "matchId": "968de776-6012-4def-8e23-251b1a677db3",
      "evidence": "chart/waterfall-bridge: Adjusted costs, $bn",
      "confidence": 0.9
    },
    {
      "name": "Waterfall / value bridge",
      "slug": "waterfall-bridge",
      "agent": null,
      "layer": "slide",
      "matchId": "d7682407-0fab-4eee-826f-ebd55458d5a7",
      "evidence": "chart/waterfall-bridge: Adjusted costs, $bn",
      "confidence": 0.9
    }
  ],
  "frameworks": [
    {
      "name": "waterfall-bridge",
      "slug": null,
      "matchId": "a0816bf3-cfb4-41a1-abb2-57e8d9da5dec",
      "evidence": "The chart visualizes the bridge between 2019 and 2021 costs.",
      "confidence": 1
    }
  ],
  "arcBeats": [],
  "loops": [
    {
      "to": 19,
      "from": 17,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "373fa453-9ff9-4b7c-b452-bc7b6d7899fd",
      "evidence": "Adjusted costs, Cost programme progress",
      "position": 0,
      "objective": "Cost programme progress",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.6,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}