{
  "docId": "019de071-52dd-7080-ab3c-cad3dac16cdb",
  "docSlug": "d68d86b4e4909e13657fc93f4c70b818",
  "documentTitle": "ads-tec Energy | SPAC Presentation Deck | 43 slides",
  "authorId": "ads-tec-energy",
  "authorName": "ads-tec Energy",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investment_bank",
  "sourceTypeLabel": "Investment bank",
  "presentationDate": "2021-08-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 16,
  "pageCount": 43,
  "prevPage": 15,
  "nextPage": 17,
  "slideType": "market_sizing",
  "function": "size_opportunity",
  "density": "overcrowded",
  "nDataPoints": 10,
  "notes": "The slide uses a mix of bulleted market facts and quantitative charts to justify the market opportunity for ultra-fast charging infrastructure.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de071-52dd-7080-ab3c-cad3dac16cdb/16",
  "deckHref": "/decks/019de071-52dd-7080-ab3c-cad3dac16cdb",
  "deckJsonHref": "/decks/019de071-52dd-7080-ab3c-cad3dac16cdb.json",
  "deckAnchorHref": "/decks/019de071-52dd-7080-ab3c-cad3dac16cdb#slide-16",
  "components": [
    {
      "bbox": {
        "h": 0.05,
        "w": 0.45,
        "x": 0.03,
        "y": 0.22
      },
      "kind": "callout",
      "text": "Ultra-fast DC chargers are critical to meet EV demand",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d61ff577-bfe5-4bec-8084-f42584cb685e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.4,
        "x": 0.52,
        "y": 0.55
      },
      "kind": "chart",
      "text": "Cumulative global ultra-fast (>150kW) connectors installed by category (000s units)(2)",
      "attrs": null,
      "subkind": "bar-stacked",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "db2a4be2-ac34-4f31-85a3-212464565425",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.4,
        "x": 0.52,
        "y": 0.22
      },
      "kind": "chart",
      "text": "Ultra-fast (>150kW) share of global EV charger hardware sales ($)(1)",
      "attrs": null,
      "subkind": "donut",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f66f5951-b75a-4df5-bf12-bdce940e934a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.55,
        "w": 0.45,
        "x": 0.03,
        "y": 0.28
      },
      "kind": "list",
      "text": "~30% CAGR in EV demand (2020-2025)\nUltra-fast charging (>150kW) accounting for ~71% of global EV charger hardware revenues(1)\nMost existing power grids in Europe & USA are not designed for area wide ultra-fast charging\n~€400bn grid expansion costs already expected until 2030 just in Europe. Massive government funds dedicated to EV infrastructure are expected",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9b3cef5f-d980-4d9e-9046-0591ce9ad0d8",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.8,
        "x": 0.03,
        "y": 0.9
      },
      "kind": "source-note",
      "text": "Sources: Eurelectric, Bloomberg NEF\nNote: (1) Calculated for new # of public and commercial connectors >150kW in 2020 multiplied by the average 2020 hardware cost per connector per power output (excl. China), Bloomberg NEF; Cumulative global connectors for public and commercial segments with hardware power greater than or equal to 150kW (excl. Home and Work)",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c60d6f8b-d16c-4be5-bf46-b8ce37e218a4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.75,
        "x": 0.03,
        "y": 0.06
      },
      "kind": "title",
      "text": "Ultra-Fast Charging as key component to EV infrastructure",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "796c8539-c9a7-4045-9f82-2e1a78d6c961",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 18,
      "from": 16,
      "beatId": "c0d16dab-552c-416c-b526-2ae36fe7b93f",
      "arcName": "The Sequoia Pitch",
      "arcSlug": "sequoia-pitch",
      "beatName": "Market Size",
      "beatSlug": "sequoia-pitch-market-size",
      "evidence": "Slides 16-18 discuss the market sizing and growth potential for ultra-fast charging.",
      "position": 2,
      "confidence": 0.8,
      "parentBeatName": "Evidence",
      "parentBeatSlug": "evidence"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}