{
  "docId": "019de070-753f-754e-8758-f0128c0bfbad",
  "docSlug": "cad140c2d52a8ae956a8fb4a811044db",
  "documentTitle": "Luminar | Investor Presentation Deck | 42 slides",
  "authorId": "luminar",
  "authorName": "Luminar",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2020-11-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 33,
  "pageCount": 42,
  "prevPage": 32,
  "nextPage": 34,
  "slideType": "roadmap",
  "function": "plan_implementation",
  "density": "balanced",
  "nDataPoints": 0,
  "notes": "The slide uses a process flow diagram to illustrate the transition from R&D to mass production, highlighting geographic distribution of manufacturing.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de070-753f-754e-8758-f0128c0bfbad/33",
  "deckHref": "/decks/019de070-753f-754e-8758-f0128c0bfbad",
  "deckJsonHref": "/decks/019de070-753f-754e-8758-f0128c0bfbad.json",
  "deckAnchorHref": "/decks/019de070-753f-754e-8758-f0128c0bfbad#slide-33",
  "components": [
    {
      "bbox": {
        "h": 0.3,
        "w": 0.9,
        "x": 0.05,
        "y": 0.15
      },
      "kind": "diagram",
      "text": "Insourced development phase (Engineering, Prototyping, Maturation) leading to Outsourced production phase (Qualification, Ramp to Volume)",
      "attrs": null,
      "subkind": "process",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "dc4a66eb-9243-4d0d-aa89-64b8fa5ca7e8",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.2,
        "x": 0.35,
        "y": 0.052
      },
      "kind": "image",
      "text": "Manufacturing floor photo",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "04027147-7490-44d0-b05d-4ee8dfcb599c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.4,
        "w": 0.35,
        "x": 0.6,
        "y": 0.05
      },
      "kind": "list",
      "text": "Outsource value-add: Mexico (Final assembly), Thailand (Key component manufacturing)",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "39b9e27f-2153-46fa-933e-28487f632fc2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.4,
        "w": 0.3,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "list",
      "text": "In-house value-add: Co-location, Assembly/Test, Fixed Cost/Cycle Time, Expertise/IP",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a0ac0479-28ff-4558-bd8e-0d55efc6565c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.4,
        "x": 0.05,
        "y": 0.04
      },
      "kind": "title",
      "text": "PRODUCT INDUSTRIALIZATION",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1eab3e84-f1b8-4f09-be5b-c167eed70ba6",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Process flow",
      "slug": "process-flow",
      "agent": null,
      "layer": "slide",
      "matchId": "cb19b327-d8c4-4d1b-87bd-9cebd75f750a",
      "evidence": "Insourced development phase (Engineering, Prototyping, Maturation) leading to Outsourced production phase (Qualification, Ramp to Volume)",
      "confidence": 0.7
    }
  ],
  "frameworks": [
    {
      "name": "value-chain",
      "slug": null,
      "matchId": "53465a05-8397-470f-a7cc-fb794f3e3fe3",
      "evidence": "The slide maps the industrialization process from internal R&D to external manufacturing and assembly.",
      "confidence": 0.9
    }
  ],
  "arcBeats": [],
  "loops": [
    {
      "to": 34,
      "from": 33,
      "name": "Why Now",
      "slug": "15-why-now",
      "bestFor": "Sales pitches, fundraising, requesting immediate budget approval",
      "matchId": "3a5b10e6-95fa-4760-8676-e69f32223921",
      "evidence": "Slides 33-34 present product industrialization and a timeline.",
      "position": 1,
      "objective": "Explain why Luminar's solution is needed now.",
      "structure": "The Context (Trends) -> The Trigger Event -> The Window of Opportunity",
      "confidence": 0.6,
      "description": "Create temporal urgency by proving that the window of opportunity is opening or closing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}