{
  "docId": "019de070-4c52-75f0-a291-66b0018a7976",
  "docSlug": "1d33df1fd89e4caf08ddfe41274cb41d",
  "documentTitle": "Lordstown Motors | SPAC Presentation Deck | 40 slides",
  "authorId": "lordstown-motors",
  "authorName": "Lordstown Motors",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investment_bank",
  "sourceTypeLabel": "Investment bank",
  "presentationDate": "2020-09-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.4285715,
  "pageNumber": 20,
  "pageCount": 40,
  "prevPage": 19,
  "nextPage": 21,
  "slideType": "roadmap",
  "function": "plan_implementation",
  "density": "dense",
  "nDataPoints": 4,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de070-4c52-75f0-a291-66b0018a7976/20",
  "deckHref": "/decks/019de070-4c52-75f0-a291-66b0018a7976",
  "deckJsonHref": "/decks/019de070-4c52-75f0-a291-66b0018a7976.json",
  "deckAnchorHref": "/decks/019de070-4c52-75f0-a291-66b0018a7976#slide-20",
  "components": [
    {
      "bbox": {
        "h": 0.3,
        "w": 0.9,
        "x": 0.05,
        "y": 0.2
      },
      "kind": "chart",
      "text": "Production Roadmap 2020-2024",
      "attrs": null,
      "subkind": "timeline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e3614128-baee-48aa-8f6f-61be772c70b3",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.45,
        "x": 0.05,
        "y": 0.6
      },
      "kind": "list",
      "text": "Working Prototype; Substantially Complete with Virtual Crash Testing; Significant Pre-Orders Received; Key Component Supply Secured Through GM; Secured Fully Operational Production Facility; Finalizing Engineering and Certification Preparations",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "172c634a-2f3d-4e60-8000-695b482ece69",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.43,
        "x": 0.52,
        "y": 0.78
      },
      "kind": "paragraph",
      "text": "As a majority of parts and processes exist today, Lordstown expects to integrate these vs. designing from scratch",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c1220f16-6f20-4c2a-93f5-f5614266adac",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.43,
        "x": 0.52,
        "y": 0.6
      },
      "kind": "paragraph",
      "text": "Lordstown has received ~40k pre-orders for the Endurance despite the fact that production is not slated to begin until 2H21, representing potential revenue sufficient to cover production into 2023",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ce5eaf87-140c-4e8f-aa1a-d7a5fd90c3a9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.4,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "title",
      "text": "Clear Path to be First to Market",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "53281f5c-3f1f-4c39-b987-075df618538d",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [
    {
      "name": "gantt-chart",
      "slug": null,
      "matchId": "c49e854e-0f6b-483d-b3de-4c78be4d9327",
      "evidence": "The production roadmap uses a timeline-based bar chart to show work streams over time.",
      "confidence": 0.9
    }
  ],
  "arcBeats": [],
  "loops": [
    {
      "to": 21,
      "from": 10,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "4b56ff5f-c6e0-4e3c-bc7c-eeee60d67478",
      "evidence": "The loop opens on slide 10 with a discussion of secular tailwinds and closes on slide 21 with a clear path to be first to market.",
      "position": 0,
      "objective": "Highlight the importance of timing in the electric vehicle market.",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.7,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}