  "docId": "019dd923-622c-750b-8b98-333f2fdb39d6",
  "docSlug": "7c592f478795",
  "documentTitle": "Oklo Inc. (OKLO)",
  "authorId": "53_Kerrisdale_Capital",
  "authorName": "Kerrisdale Capital",
  "documentKindSlug": "research-note",
  "documentKindLabel": "Research note",
  "sourceTypeSlug": "short_seller",
  "sourceTypeLabel": "Short seller",
  "presentationDate": "2024-11-01 00:00:00",
  "orientation": "portrait",
  "aspectRatio": 0.77272725,
  "pageNumber": 18,
  "pageCount": 26,
  "prevPage": 17,
  "nextPage": 19,
  "slideType": "preempt_rebuttal",
  "function": "preempt_rebuttal",
  "density": "dense",
  "nDataPoints": 5,
  "notes": "The slide uses a bar chart to visualize the Morgan Stanley projection of SMR market share in data center power capacity.",
  "elementsJson": [
    "paragraph",
    "bar_chart_vertical",
    "footnote"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-622c-750b-8b98-333f2fdb39d6/18",
  "deckHref": "/decks/019dd923-622c-750b-8b98-333f2fdb39d6",
  "deckJsonHref": "/decks/019dd923-622c-750b-8b98-333f2fdb39d6.json",
  "deckAnchorHref": "/decks/019dd923-622c-750b-8b98-333f2fdb39d6#slide-18",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "This view is captured in an October 23rd note from Morgan Stanley which estimated only 1%-3% of all incremental US data center power capacity (~2-5 GWe) through 2035 would be provided by SMRs.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd953-0f20-71ed-bdde-aca4c7213475",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.325,
        "w": 0.764,
        "x": 0.118,
        "y": 0.378
      },
      "kind": "chart",
      "text": "SMR Percent of US Data Center Power Projected for 2035",
      "attrs": null,
      "subkind": "bar-vertical",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6d1f96ba-e5c2-48da-a2ee-3f558e661306",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "SMR Power Capacity (GW): 3.0%",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd953-0f20-71ed-bdde-b72e380d78be",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.764,
        "x": 0.118,
        "y": 0.718
      },
      "kind": "paragraph",
      "text": "A June 2024 forecast for new advanced reactor / SMR builds from Citi Research arrived at a similar conclusion:",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "868d2ca5-cc07-42fb-a21a-a9b2e2a2e04e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.185,
        "w": 0.764,
        "x": 0.118,
        "y": 0.235
      },
      "kind": "paragraph",
      "text": "Given the checkered history of sodium-cooled reactors, we think it is unrealistic to think Oklo switches on an Aurora powerhouse for data center customers, who are generally not in the business of experimenting with new technologies and accustomed to \"five 9s\" uptime, without first accumulating years of operating experience. Any data center operator that would deploy an Aurora unit without such validation would incur the costly risk of unexpected/extended shutdowns. Given the lack of proven performance, we are skeptical Oklo’s non-binding LOIs from data centers will convert into meaningful new deployments for the foreseeable future. This view is captured in an October 23rd note from Morgan Stanley which estimated only 1%-3% of all incremental US data center power capacity (~2-5 GWe) through 2035 would be provided by SMRs.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ae6a96bb-7f7f-4fd1-b134-d90e96f30a6f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.135,
        "w": 0.764,
        "x": 0.118,
        "y": 0.093
      },
      "kind": "paragraph",
      "text": "demand. Though it runs counter to recent enthusiasm for nuclear as a power source, as described above by Astrid Atkinson (who spent 15 years at Google leading framework infrastructure engineering), the vast majority of data centers demand is not driven by carbon-free baseload needs from Big Tech and will not be supplied by nuclear (conventional or advanced), but rather natural gas fired CCGTs with greater certainty of execution and lower costs.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ccd59740-a7d5-4ea7-a32e-4693c5d8df43",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "quote",
      "text": "This view is captured in an October 23rd note from Morgan Stanley which estimated only 1%-3% of all incremental US data center power capacity (~2-5 GWe) through 2035 would be provided by SMRs. — Morgan Stanley, A Nuclear Renaissance for SMRs, October 23, 2024.",
      "attrs": null,
      "subkind": null,
      "toolName": "Authority citation",
      "toolSlug": "authority-citation",
      "confidence": null,
      "componentId": "019dd953-0f20-71ed-bdde-b1683bebf46c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.45,
        "x": 0.118,
        "y": 0.685
      },
      "kind": "source-note",
      "text": "Source: Morgan Stanley, A Nuclear Renaissance for SMRs, October 23, 2024.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "79fa7f12-cb30-4693-a90e-ff7ad12be315",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Before/after framing",
      "slug": "before-after-framing",
      "agent": null,
      "layer": "slide",
      "matchId": "305f493a-6bfb-49cb-b143-b73c3ba2073d",
      "evidence": "The slide presents a comparison of projections for data center power demand and SMR capacity, implying a contrast between current and future states.",
      "confidence": 0.7
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 20,
      "from": 18,
      "beatId": "bc83c922-e736-4841-97ea-dce27b8820e2",
      "arcName": "Overcoming the Monster",
      "arcSlug": "overcoming-monster",
      "beatName": "The Struggle",
      "beatSlug": "overcoming-monster-the-struggle",
      "evidence": "The document discusses the potential consequences of Oklo's challenges, including the impact on its customer pipeline and financials.",
      "position": 1,
      "confidence": 0.8,
      "parentBeatName": "Development",
      "parentBeatSlug": "development"
    }
  ],
  "loops": [
    {
      "to": 20,
      "from": 18,
      "name": "Mece Breakdown",
      "slug": "40-mece-breakdown",
      "bestFor": "Problem structuring, ensuring completeness, strategic analysis",
      "matchId": "eb715758-6445-4630-bb07-b2d1311fb76b",
      "evidence": "The document discusses the potential consequences of Oklo's challenges.",
      "position": 1,
      "objective": "How do Oklo's challenges impact its customer pipeline and financials?",
      "structure": "The Whole -> Category A (distinct) -> Category B (distinct) -> Category C (distinct) -> Complete Coverage",
      "confidence": 0.6,
      "description": "Divide a complex topic into mutually exclusive, collectively exhaustive categories"
    }
  ],
  "imagePathAlt": null,