  "docId": "019dd923-622b-71dc-a6dc-f627b2cd690f",
  "docSlug": "d5cf668f7ec6",
  "documentTitle": "BP plc (BP)",
  "authorId": "23_Bluebell_Capital",
  "authorName": "Giuseppe Bivona and Marco Taricco",
  "documentKindSlug": "shareholder-letter",
  "documentKindLabel": "Shareholder letter",
  "sourceTypeSlug": "activist_investor",
  "sourceTypeLabel": "Activist investor",
  "presentationDate": "2024-07-23 00:00:00",
  "orientation": "portrait",
  "aspectRatio": 0.70656973,
  "pageNumber": 7,
  "pageCount": 20,
  "prevPage": 6,
  "nextPage": 8,
  "slideType": "appendix_disclosure",
  "function": "establish_context",
  "density": "overcrowded",
  "nDataPoints": 2,
  "notes": "The slide discusses the impact of the National Policy Statement for Renewable Energy Infrastructure (EN-3) on solar capacity assessment.",
  "elementsJson": [
    "paragraph",
    "callout_box",
    "footnote"
  ],
  "metadataConfidence": 0.95,
  "imagePath": null,
  "slideHref": "/slides/019dd923-622b-71dc-a6dc-f627b2cd690f/7",
  "deckHref": "/decks/019dd923-622b-71dc-a6dc-f627b2cd690f",
  "deckJsonHref": "/decks/019dd923-622b-71dc-a6dc-f627b2cd690f.json",
  "deckAnchorHref": "/decks/019dd923-622b-71dc-a6dc-f627b2cd690f#slide-7",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "We have learned, with disbelief, that in June 2024, BP re-submitted a virtually unchanged application at Burnhope (Appendix 7 and 8), from the application whose authorization was overturned by a judge in February 2024.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd953-3f40-73bb-a5fe-411bd7ae6b4b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.7,
        "x": 0.15,
        "y": 0.66
      },
      "kind": "paragraph",
      "text": "We have learned, with disbelief, that in June 2024, BP re-submitted a virtually unchanged application at Burnhope (Appendix 7 and 8), from the application whose authorization was overturned by a judge in February 2024. On this occasion, in contrast to previous application, BP made it clear that:",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6683e0d8-a81c-4781-a397-28041ea913e7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.7,
        "x": 0.15,
        "y": 0.15
      },
      "kind": "paragraph",
      "text": "Before evaluating the further developments in BP's solar activities in 2024, it is necessary to make a brief note regarding the regulatory change which took place in January 2024. As we all know, solar panels generate electricity in direct current (DC) form. Several panels feed an external inverter, which is used to convert the electricity to alternating current (AC). For the purposes of determining the capacity thresholds in Section 15 of the 2008 Act, all forms of generation other than solar are currently assessed on an AC basis, while a practice has developed where solar farms are assessed on their DC capacity. Under the latest amendment of the National Policy Statement for Renewable Energy Infrastructure, which became effective on January 17th, 2024 (\"EN-3\", Appendix 6), the Secretary of State has decided that this disparity should end, particularly as electricity from some other forms of generation is switched between DC and AC within a generator, before it is measured. For the purposes of Section 15 of the Planning Act 2008, the maximum combined capacity of the installed inverters (measured in alternating current, i.e., AC) should now be used for determining solar site capacity.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e65d2837-2e2f-4384-a633-9a197ce339a6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.6,
        "x": 0.2,
        "y": 0.76
      },
      "kind": "quote",
      "text": "\"1.8 The Burnhope Solar Farm will have maximum combined capacity of the installed inverters of ~49.9MWac, with an installed solar panel capacity of ~76MW\" (\"Land off Edge Lane, Burnhope Planning Statement Installation and operation of a solar farm,",
      "attrs": null,
      "subkind": "pull-quote",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "96edd90a-c9fa-4b18-9a82-f83aea976479",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "quote",
      "text": "1.8 The Burnhope Solar Farm will have maximum combined capacity of the installed inverters of ~49.9MWac, with an installed solar panel capacity of ~76MW — Land off Edge Lane, Burnhope Planning Statement Installation and operation of a solar farm",
      "attrs": null,
      "subkind": null,
      "toolName": "Authority citation",
      "toolSlug": "authority-citation",
      "confidence": null,
      "componentId": "019dd953-3f40-73bb-a5fe-4728fb3f3cba",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.7,
        "x": 0.15,
        "y": 0.86
      },
      "kind": "source-note",
      "text": "5 https://www.gov.uk/government/publications/national-policy-statement-for-renewable-energy-infrastructure-en-3\n6 https://assets.publishing.service.gov.uk/media/65a7889996a5ec000d731aba/nps-renewable-energy-infrastructure-en3.pdf",
      "attrs": {
        "numbered": true
      },
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "25bbc791-4a21-486b-8add-a5499b66754e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.7,
        "x": 0.15,
        "y": 0.11
      },
      "kind": "title",
      "text": "A brief note on the regulatory change which occurred in January 2024",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "36c6dd0f-9d8b-440b-b0d2-d7497c70e16e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.6,
        "x": 0.15,
        "y": 0.62
      },
      "kind": "title",
      "text": "2. BP's Second Planning Application at Burnhope and Hett Moor",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b85a767c-16fe-486a-9978-8223402d52ad",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 10,
      "from": 4,
      "beatId": "885134a8-095f-451a-9c7b-5d545567b761",
      "arcName": "Overcoming the Monster",
      "arcSlug": "overcoming-monster",
      "beatName": "The Struggle",
      "beatSlug": "overcoming-monster-the-struggle",
      "evidence": "The document presents the struggles and challenges faced by shareholders due to the Board's actions",
      "position": 1,
      "confidence": 0.8,
      "parentBeatName": "Development",
      "parentBeatSlug": "development"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}