{
  "docId": "019dd923-5f69-752d-a9b8-6a4e8b481cd9",
  "docSlug": "U3ir4FVCwlyqcoIxMQ6L",
  "documentTitle": "Evisort's CEO walks through the 11-page pitch deck that the contract software startup used to nab $35 million from investors like General Atlantic — and lays out its path to an IPO",
  "authorId": "Pitchdecks",
  "authorName": "Evisort",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.777,
  "pageNumber": 3,
  "pageCount": 11,
  "prevPage": 2,
  "nextPage": 4,
  "slideType": "problem_statement",
  "function": "frame_problem",
  "density": "dense",
  "nDataPoints": 0,
  "notes": "Uses a simple linear process flow to contrast two distinct problem areas.",
  "elementsJson": [
    "action_title",
    "process_diagram"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5f69-752d-a9b8-6a4e8b481cd9/3",
  "deckHref": "/decks/019dd923-5f69-752d-a9b8-6a4e8b481cd9",
  "deckJsonHref": "/decks/019dd923-5f69-752d-a9b8-6a4e8b481cd9.json",
  "deckAnchorHref": "/decks/019dd923-5f69-752d-a9b8-6a4e8b481cd9#slide-3",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "This slows down deals and provides no transparency to the process; Mismanagement of contracts drive costly mistakes and missed opportunities.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd952-a28f-707d-b934-e10c1f42cccb",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.84,
        "x": 0.08,
        "y": 0.25
      },
      "kind": "diagram",
      "text": "Pre-Signing | Contract Signed | Post-Signing",
      "attrs": null,
      "subkind": "process",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c8bcdf1b-a962-4d3c-9b50-6b7607f084a6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.35,
        "x": 0.08,
        "y": 0.45
      },
      "kind": "paragraph",
      "text": "This slows down deals and provides no transparency to the process",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "321528aa-d63a-4d5a-ad93-82dd1fb47656",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.35,
        "x": 0.57,
        "y": 0.45
      },
      "kind": "paragraph",
      "text": "Mismanagement of contracts drive costly mistakes and missed opportunities",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f912a4d5-59d6-4b6e-bc5d-9417c8ec8214",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.15,
        "x": 0.82,
        "y": 0.95
      },
      "kind": "source-note",
      "text": "CONFIDENTIAL DOCUMENT",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "492a6d8f-5e4e-4ffa-81a7-802c18b3fb92",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.9,
        "x": 0.05,
        "y": 0.08
      },
      "kind": "title",
      "text": "Current Contract Operations Are Highly Manual, Risky, and Expensive with Multiple Systems",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bf915b31-cae4-402f-9c5a-5b061a7906a6",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Audience Definition",
      "slug": "audience-definition",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "3c0ab9f9-f9cf-488d-93e4-a7b52bc175db",
      "evidence": "Mismanagement of contracts drive costly mistakes and missed opportunities",
      "confidence": 0.5
    },
    {
      "name": "Problem Statement Canvas",
      "slug": "problem-statement-canvas",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "d78fe3fa-412d-452f-ad0a-9296ad6cdf33",
      "evidence": "Current Contract Operations Are Highly Manual, Risky, and Expensive with Multiple Systems",
      "confidence": 0.7
    }
  ],
  "frameworks": [
    {
      "name": "before-after-framing",
      "slug": null,
      "matchId": "24246c09-dbb7-45bf-8f1a-b3315e4c2701",
      "evidence": "Frames current state as problematic to set up a future solution.",
      "confidence": 0.8
    }
  ],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}