{
  "docId": "019dd923-5eff-723e-9be7-5d6e73ab277d",
  "docSlug": "f9e84ffd149e06c5",
  "documentTitle": "2025 Annual Report",
  "authorId": "Lufthansa",
  "authorName": "Lufthansa Group",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.414,
  "pageNumber": 91,
  "pageCount": 414,
  "prevPage": 90,
  "nextPage": 92,
  "slideType": "appendix_disclosure",
  "function": "summarize",
  "density": "overcrowded",
  "nDataPoints": 2,
  "notes": "This is a page from an annual report, specifically the 'Combined management report' section.",
  "elementsJson": [
    "paragraph"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5eff-723e-9be7-5d6e73ab277d/91",
  "deckHref": "/decks/019dd923-5eff-723e-9be7-5d6e73ab277d",
  "deckJsonHref": "/decks/019dd923-5eff-723e-9be7-5d6e73ab277d.json",
  "deckAnchorHref": "/decks/019dd923-5eff-723e-9be7-5d6e73ab277d#slide-91",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "The Lufthansa Group's internal control system (ICS) covers all the principles, procedures and steps intended to ensure effective, economical and accurate key processes and compliance with the relevant legal regulations.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd952-7324-708b-9b21-f217b1528128",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "framework",
      "text": "COSO",
      "attrs": null,
      "subkind": null,
      "toolName": "Structuring frame",
      "toolSlug": "structuring-frame",
      "confidence": null,
      "componentId": "019dd952-7324-708b-9b21-fb68f722339f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "net operating requirement: USD 4.3bn",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd952-7324-708b-9b21-f4640233df69",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.28,
        "x": 0.38,
        "y": 0.51
      },
      "kind": "paragraph",
      "text": "The Lufthansa Group's internal control system (ICS) covers all the principles, procedures and steps intended to ensure effective, economical and accurate key processes and compliance with the relevant legal regulations. It is based on the COSO framework.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0b3ab420-7b5b-4668-9625-23faae44e88b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.28,
        "x": 0.68,
        "y": 0.18
      },
      "kind": "paragraph",
      "text": "Overall responsibility for the ICS required to manage risk lies with the Executive Board of the Lufthansa Group, which defines the scope and the format of the systems in place based on the specific requirements of the Lufthansa Group.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4634e817-4dcb-44d6-842d-19c377757573",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.28,
        "x": 0.08,
        "y": 0.37
      },
      "kind": "paragraph",
      "text": "The Lufthansa Group reported a continued increase in demand for air travel in the 2025 financial year. The Lufthansa Group Passenger Airlines was able to increase its capacity and revenue further as a result.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8a0b8357-6bee-4f85-9dca-28cb039322fa",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.25,
        "x": 0.08,
        "y": 0.28
      },
      "kind": "title",
      "text": "Overall statement on opportunities and risks",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "17bbecfc-d9eb-420f-8e70-e93acd3aa090",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.25,
        "x": 0.38,
        "y": 0.44
      },
      "kind": "title",
      "text": "Description of the internal control system",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "7b84b6da-e565-4583-a91c-e71e77ce8951",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [
    {
      "name": "COSO Internal Control",
      "slug": null,
      "matchId": "019debc8-aafa-716d-965a-ce4a5e156c86",
      "evidence": "ICS framework explicitly references COSO principles",
      "confidence": 70
    }
  ],
  "arcBeats": [
    {
      "to": 250,
      "from": 78,
      "beatId": "019debc8-a173-720a-9609-f76c8cf8b075",
      "arcName": "The Triple Take",
      "arcSlug": "triple-take",
      "beatName": "The Implications (So What)",
      "beatSlug": null,
      "evidence": "Risk report, opportunities, double materiality, ESRS climate/social/governance impacts",
      "position": 2,
      "confidence": 60,
      "parentBeatName": null,
      "parentBeatSlug": null
    },
    {
      "to": 92,
      "from": 41,
      "beatId": "019debc8-a246-719d-9533-165603d2bf40",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Evidence & Proof",
      "beatSlug": null,
      "evidence": "Detailed segment performance, financial reconciliations, risk register",
      "position": 4,
      "confidence": 50,
      "parentBeatName": null,
      "parentBeatSlug": null
    }
  ],
  "loops": [
    {
      "to": 92,
      "from": 78,
      "name": "Pre Mortem",
      "slug": "19-pre-mortem",
      "bestFor": "Project kick-offs, risk management, building trust with skeptical stakeholders",
      "matchId": "019debc8-a35a-71cf-88a6-3da754e1adb0",
      "evidence": "Opportunities and risk report enumerates A/B/C/D risks with prevention measures",
      "position": 7,
      "objective": "Anticipate failure modes via top risk register and mitigation plans",
      "structure": "The Future Disaster (Hypothetical) -> What Went Wrong -> The Prevention Plan",
      "confidence": 70,
      "description": "Build trust by anticipating failure modes before they happen and solving them in advance"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}