{
  "docId": "019dd923-5e88-73ef-bd5e-2805f44a3e9d",
  "docSlug": "9391d4ae69e8c315",
  "documentTitle": "2026 04 Investor Presentation",
  "authorId": "Applied-Digital",
  "authorName": "Applied Digital",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.647,
  "pageNumber": 16,
  "pageCount": 46,
  "prevPage": 15,
  "nextPage": 17,
  "slideType": "problem_statement",
  "function": "frame_problem",
  "density": "dense",
  "nDataPoints": 6,
  "notes": "The slide contrasts the urgent need for power (45-50 GW by 2030) with the long lead times for traditional energy sources like nuclear.",
  "elementsJson": [
    "headline_text",
    "bullet_list",
    "photo",
    "comparison_table",
    "footnote"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5e88-73ef-bd5e-2805f44a3e9d/16",
  "deckHref": "/decks/019dd923-5e88-73ef-bd5e-2805f44a3e9d",
  "deckJsonHref": "/decks/019dd923-5e88-73ef-bd5e-2805f44a3e9d.json",
  "deckAnchorHref": "/decks/019dd923-5e88-73ef-bd5e-2805f44a3e9d#slide-16",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "Boston Consulting Group estimate that the U.S. data center power shortage could exceed 45 GW is projected by 2030.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd952-5bea-70fa-aef1-bba9012f4250",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.44,
        "x": 0.53,
        "y": 0.25
      },
      "kind": "image",
      "text": "Power plant infrastructure",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bd167b69-ba57-4b13-a70c-5addc3f6a282",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.45,
        "w": 0.45,
        "x": 0.03,
        "y": 0.25
      },
      "kind": "list",
      "text": "Global demand for data center capacity is projected to triple by 2030. Boston Consulting Group estimate that the U.S. data center power shortage could exceed 45 GW by 2030. The DOE projects 100 GW new capacity needed, 50 GW for data centers.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a5fc4b93-a6d7-4589-a629-0bb9c30eec18",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "GW capacity: 45 GW",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd952-5bea-70fa-aef1-bd660cad970e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.3,
        "x": 0.03,
        "y": 0.91
      },
      "kind": "source-note",
      "text": "(10) Boston Consulting Group's January 2025 report, titled \"Breaking Barriers to Data Center Growth\" (11) Risk of power outages increase 100x by 2030, warns DOE",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "21f7fc54-fc08-4e3d-a4ea-6ecf7bc9a8fb",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.44,
        "x": 0.53,
        "y": 0.62
      },
      "kind": "table",
      "text": "Energy source build time comparison table",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f6a5f98c-36c8-40c1-990d-8dc4c290d5e1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.5,
        "x": 0.03,
        "y": 0.13
      },
      "kind": "title",
      "text": "Constraining AI Data Center Market and AI Rollout",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b59d69a9-43ce-43ac-9694-a98357c563e4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.35,
        "x": 0.03,
        "y": 0.05
      },
      "kind": "title",
      "text": "Power Availability",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f78ba4b8-4637-41a3-98d0-22c0f317b089",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Action Titles",
      "slug": "action-titles",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "019dd95a-1c1c-7608-8ed3-e5aef706c32e",
      "evidence": "Subtitle states the constraint thesis directly",
      "confidence": 88
    },
    {
      "name": "Authority Bias",
      "slug": "authority-bias",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "019dd95a-1c1c-7608-8ed3-e8080d1fac8c",
      "evidence": "BCG and US DOE cited as sources for shortage estimate",
      "confidence": 90
    },
    {
      "name": "Credibility Transfer",
      "slug": "credibility-transfer",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "019dd95a-1c1c-7608-8ed3-ec1c4dc039ca",
      "evidence": "Borrows BCG and DOE authority for the 45GW / 100GW claims",
      "confidence": 82
    },
    {
      "name": "Problem Statement Canvas",
      "slug": "problem-statement-canvas",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "b3e254cd-07c0-46ca-9976-4237d970255d",
      "evidence": "The slide presents a problem statement around power availability and data center capacity.",
      "confidence": 0.7
    },
    {
      "name": "Von Restorff Effect",
      "slug": "von-restorff-effect",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019dd95a-1c1c-7608-8ed3-f1fb3af45196",
      "evidence": "Nuclear '~10-15 Years Total' highlighted in red against neutral table",
      "confidence": 70
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 16,
      "from": 9,
      "beatId": "019dd95a-07a7-7579-bd67-a8aa3ebf2f39",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Problem & Complication",
      "beatSlug": "consultants-gambit-problem-complication",
      "evidence": "AI demand exploding, GPU power, $700B capex, 45GW US shortage",
      "position": 2,
      "confidence": 82,
      "parentBeatName": "Complication",
      "parentBeatSlug": "complication"
    },
    {
      "to": 16,
      "from": 13,
      "beatId": "019dd95a-07a7-7579-bd67-c0dc64ead830",
      "arcName": "The Sequoia Pitch",
      "arcSlug": "sequoia-pitch",
      "beatName": "Why Now",
      "beatSlug": "sequoia-pitch-why-now",
      "evidence": "Construction exploding, $700B capex, 45GW shortage by 2030",
      "position": 3,
      "confidence": 55,
      "parentBeatName": "Evidence",
      "parentBeatSlug": "evidence"
    }
  ],
  "loops": [
    {
      "to": 16,
      "from": 10,
      "name": "Why Now",
      "slug": "15-why-now",
      "bestFor": "Sales pitches, fundraising, requesting immediate budget approval",
      "matchId": "019dd95a-08f8-7619-ac2f-e3ac09fe8fa8",
      "evidence": "Trends (15x electricity, 1M× compute, $700B capex) + trigger event (45GW shortage by 2030) = window of opportunity",
      "position": 1,
      "objective": "Establish urgency: AI compute is exploding while US power supply falls short",
      "structure": "The Context (Trends) -> The Trigger Event -> The Window of Opportunity",
      "confidence": 80,
      "description": "Create temporal urgency by proving that the window of opportunity is opening or closing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}