  "docId": "019dd923-5e88-73ef-bd58-542943ed42f8",
  "docSlug": "f20c241b6d78cc7b",
  "documentTitle": "energy summit chiavari",
  "authorId": "MorganStanley",
  "authorName": "EY",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "equity_research",
  "sourceTypeLabel": "Equity research",
  "presentationDate": null,
  "orientation": "portrait",
  "aspectRatio": 0.707,
  "pageNumber": 68,
  "pageCount": 96,
  "prevPage": 67,
  "nextPage": 69,
  "slideType": "industry_trends",
  "function": "present_solution",
  "density": "overcrowded",
  "nDataPoints": 6,
  "notes": "The slide highlights government support, current capacity, future projections, and specific project examples from Adani Green, Greenko, and Tata Power.",
  "elementsJson": [
    "paragraph",
    "line_chart",
    "bullet_list",
    "footnote"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5e88-73ef-bd58-542943ed42f8/68",
  "deckHref": "/decks/019dd923-5e88-73ef-bd58-542943ed42f8",
  "deckJsonHref": "/decks/019dd923-5e88-73ef-bd58-542943ed42f8.json",
  "deckAnchorHref": "/decks/019dd923-5e88-73ef-bd58-542943ed42f8#slide-68",
  "components": [
    {
      "bbox": {
        "h": 0.25,
        "w": 0.86,
        "x": 0.07,
        "y": 0.24
      },
      "kind": "chart",
      "text": "Figure 41: Projected PSP capacity requirement (in GW)",
      "attrs": null,
      "subkind": "line",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5d5a78b6-f1d0-47ee-a357-454682d67163",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.42,
        "x": 0.51,
        "y": 0.53
      },
      "kind": "list",
      "text": "Greenko Energies: Greenko Energies is developing a PSP in Madhya Pradesh with a capacity of 1,440 MW. The estimated cost of the project is INR6,991 crore (US$ 852.5 million).",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "14b319ac-b5c0-43f8-823d-f68426da81c2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.42,
        "x": 0.51,
        "y": 0.65
      },
      "kind": "list",
      "text": "Tata Power: In August 2023, Tata Power and the Government of Maharashtra have signed an MoU to set up two PSPs with a total capacity of 2.8 GW in Pune (1.8 GW) and Raigarh (1 GW).",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1ce4cc15-48be-48f1-8964-96cd8c3311bf",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.42,
        "x": 0.07,
        "y": 0.58
      },
      "kind": "list",
      "text": "Adani Green: In June 2022, the State Investment Promotion Board of Government of Andhra Pradesh cleared four PSPs planned by Adani Green with a cumulative capacity of 3.7 GW and an estimated investment of INR15,740 crore (US$ 1.9 billion).",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5c0c5bc4-9776-44c5-b2a9-895b737491e7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "GW: 26.69",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd952-340f-723f-8a1f-e89e4a6d6757",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.42,
        "x": 0.07,
        "y": 0.14
      },
      "kind": "paragraph",
      "text": "The Indian government acknowledges the importance of Pumped Storage Projects (PSPs) in the country's energy storage landscape and has initiated various steps to foster their growth. In the 2024-25 Union Budget, it was declared that a dedicated policy aimed at encouraging the development of PSPs will be introduced.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ec8ac189-8902-4c20-86ef-e3559b61b40f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.42,
        "x": 0.51,
        "y": 0.14
      },
      "kind": "paragraph",
      "text": "As of now, India's operational PSP capacity stands at approximately 4.76 gigawatts, spread across eight different projects. The Central Electricity Authority (CEA) anticipates a substantial rise in the demand for installed PSP capacity in the coming years.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ec956586-515b-4c40-9de6-b85328bf6805",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.86,
        "x": 0.07,
        "y": 0.91
      },
      "kind": "source-note",
      "text": "106-110. References and footnotes regarding data sources.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "980bd2a8-dba7-40a5-9d5e-e639e23077ee",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Audience Definition",
      "slug": "audience-definition",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "0092eff4-dd29-42fd-9920-e3bfe3ad4f48",
      "evidence": "The Indian government acknowledges the importance of Pumped Storage Projects (PSPs) in the country's energy storage landscape and has initiated various steps to foster their growth.",
      "confidence": 0.7
    },
    {
      "name": "Data Story Arc",
      "slug": "data-story-arc",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "d3b70b07-2f12-48dc-bc47-e9d5cbb26d74",
      "evidence": "As of now, India's operational PSP capacity stands at approximately 4.76 gigawatts, spread across eight different projects. The Central Electricity Authority (CEA) anticipates a substantial rise in t",
      "confidence": 0.6
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}