{
  "docId": "019dd923-5e88-73ef-bd58-542943ed42f8",
  "docSlug": "f20c241b6d78cc7b",
  "documentTitle": "energy summit chiavari",
  "authorId": "MorganStanley",
  "authorName": "EY",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "equity_research",
  "sourceTypeLabel": "Equity research",
  "presentationDate": null,
  "orientation": "portrait",
  "aspectRatio": 0.707,
  "pageNumber": 34,
  "pageCount": 96,
  "prevPage": 33,
  "nextPage": 35,
  "slideType": "industry_trends",
  "function": "analyze_data",
  "density": "overcrowded",
  "nDataPoints": 16,
  "notes": "The slide includes a bar chart showing Tendered vs Allotted GW capacity over time, with annotations for specific tender milestones.",
  "elementsJson": [
    "paragraph",
    "bar_chart_grouped",
    "footnote"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5e88-73ef-bd58-542943ed42f8/34",
  "deckHref": "/decks/019dd923-5e88-73ef-bd58-542943ed42f8",
  "deckJsonHref": "/decks/019dd923-5e88-73ef-bd58-542943ed42f8.json",
  "deckAnchorHref": "/decks/019dd923-5e88-73ef-bd58-542943ed42f8#slide-34",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "The bidding trajectory mandated at least 50GW of RE tenders to be issued for FY2024, which was easily met with a record of over 69GW of tenders issued.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd952-340f-723f-8a1c-1b4d16dcfee4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.86,
        "x": 0.07,
        "y": 0.52
      },
      "kind": "chart",
      "text": "Figure 12: Utility scale RE tender issuance trajectory in India",
      "attrs": null,
      "subkind": "bar-grouped",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f1e50403-330a-46ba-91d0-12d3281945ff",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Renewable Energy Tendered Capacity (GW): 69.8",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd952-340f-723f-8a1c-1d1d086bcc00",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.18,
        "w": 0.88,
        "x": 0.06,
        "y": 0.34
      },
      "kind": "paragraph",
      "text": "Until 2016, government had issued tenders for development of utility scale solar tenders. In 2016, SECI initiated the first wind tendering process in India. With a focus on supplying round-the-clock renewable energy, In 2018, SECI issued the first solar wind hybrid tender of 1200 MW and later introduced Energy Storage Systems (ESS) in the RE tendering landscape. Post 2019, RE tendering experienced a downward trend mainly because of COVID-19 pandemic and associated supply chain issues. In March 2023, the government issued the annual bidding trajectory for RE to attain its 500GW non-fossil fuel capacity target by 2030. The bidding trajectory mandated at least 50GW of RE tenders to be issued for FY2024, which was easily met with a record of over 69GW of tenders issued. In addition, over 22GW of standalone ESS (without RE components) tenders were also issued in the calendar year 2023. This, Pumped Hydro Storage projects accounted for about 20GW.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e2e3c38a-286d-4597-ad54-ed7d656f8aa5",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.15,
        "x": 0.07,
        "y": 0.81
      },
      "kind": "source-note",
      "text": "Source: JMK Research",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "03e3deb5-9809-4f21-b964-f6ef83169780",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.45,
        "x": 0.06,
        "y": 0.93
      },
      "kind": "source-note",
      "text": "21. Utility-scale Renewable Energy Tendering Trends in India May 2024, IEEFA",
      "attrs": {
        "numbered": true
      },
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e75a9989-c137-41af-8647-8c67826cb958",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.88,
        "x": 0.06,
        "y": 0.29
      },
      "kind": "title",
      "text": "3.1.4 Tenders issued by the government for development of renewable energy sources viz. solar, wind and hybrid in the last decade",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8438ad64-def7-4a70-9613-9a387d5dc81d",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Chart Selection Guide",
      "slug": "chart-selection-guide",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "8ebd0782-c31f-4163-886b-596fa123c529",
      "evidence": "The slide features a bar chart showing utility scale RE tender issuance trajectory in India, indicating consideration of chart selection for effective communication.",
      "confidence": 0.5
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}