{
  "docId": "019dd923-5e88-73ef-bd58-542943ed42f8",
  "docSlug": "f20c241b6d78cc7b",
  "documentTitle": "energy summit chiavari",
  "authorId": "MorganStanley",
  "authorName": "EY",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "equity_research",
  "sourceTypeLabel": "Equity research",
  "presentationDate": null,
  "orientation": "portrait",
  "aspectRatio": 0.707,
  "pageNumber": 33,
  "pageCount": 96,
  "prevPage": 32,
  "nextPage": 34,
  "slideType": "industry_trends",
  "function": "summarize",
  "density": "overcrowded",
  "nDataPoints": 11,
  "notes": "The slide contains two distinct sections: one for offshore wind and one for hydropower, with a supporting bar chart for hydropower capacity.",
  "elementsJson": [
    "paragraph",
    "bullet_list",
    "bar_chart_vertical"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5e88-73ef-bd58-542943ed42f8/33",
  "deckHref": "/decks/019dd923-5e88-73ef-bd58-542943ed42f8",
  "deckJsonHref": "/decks/019dd923-5e88-73ef-bd58-542943ed42f8.json",
  "deckAnchorHref": "/decks/019dd923-5e88-73ef-bd58-542943ed42f8#slide-33",
  "components": [
    {
      "bbox": {
        "h": 0.22,
        "w": 0.84,
        "x": 0.08,
        "y": 0.69
      },
      "kind": "chart",
      "text": "Figure 11: Installed hydro capacity from FY15 until FY25",
      "attrs": null,
      "subkind": "bar-vertical",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4a955c32-984d-49a7-a840-8ea52380f7fd",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.4,
        "x": 0.52,
        "y": 0.29
      },
      "kind": "list",
      "text": "Central Transmission Utility planned infrastructure for initial 10 GW offshore capacity.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "04664d50-6811-4043-b1a0-551663eb1f81",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.4,
        "x": 0.08,
        "y": 0.62
      },
      "kind": "list",
      "text": "Notification of Hydro Purchase Obligation (HPO) as a separate obligation for DISCOMs.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0f26d03b-b5e5-41af-9e76-ee443ee94efd",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.4,
        "x": 0.08,
        "y": 0.17
      },
      "kind": "list",
      "text": "India's target of 500 GW renewables by 2030 includes 100 GW from wind, with 30 GW from offshore wind. MNRE estimates 70 GW potential split between Gujarat (36 GW) and Tamil Nadu (35 GW).",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1d995ad3-87a3-426f-a50c-6bceebc54d13",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.07,
        "w": 0.4,
        "x": 0.08,
        "y": 0.37
      },
      "kind": "list",
      "text": "Viability gap funding (VGF) of INR7453 crore approved for 1 GW offshore wind projects (500 MW each in Gujarat and Tamil Nadu).",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "69343b5a-0ab6-4265-965b-1b7398b4cc61",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.4,
        "x": 0.52,
        "y": 0.58
      },
      "kind": "list",
      "text": "Budgetary support provided for infrastructure (roads/bridges) for hydro projects.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ac8ca880-76f5-452c-929e-cb27ea00d1fd",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.4,
        "x": 0.08,
        "y": 0.31
      },
      "kind": "list",
      "text": "Offshore wind lease rules published Feb 2024; SECI announced 4GW seabed leasing in Tamil Nadu.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b7e0be51-2b3d-4d09-9569-7fe0365305c1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.4,
        "x": 0.08,
        "y": 0.53
      },
      "kind": "list",
      "text": "Hydropower potential expected to rise from 47 GW to 67 GW by 2031-32. 15 GW currently under construction.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c4d358ee-94ff-4d34-a86b-eeb77196feda",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.4,
        "x": 0.52,
        "y": 0.21
      },
      "kind": "list",
      "text": "Revised strategy for 37 GW capacity of off-shore wind site leases over next seven years.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "fc179418-48c8-4925-8bcf-d8ad9a87b67b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Installed hydro capacity (GW): 47",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd952-340f-723f-8a1b-97a88b03eec9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.01,
        "w": 0.1,
        "x": 0.08,
        "y": 0.91
      },
      "kind": "source-note",
      "text": "Source: Niti Aayog",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d6c1463f-52c2-4c0f-aef5-56aa423f9bd2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.35,
        "x": 0.08,
        "y": 0.49
      },
      "kind": "title",
      "text": "3.1.3 Developments in hydro power sector",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3aca6fa7-f615-431f-b4af-b7cf66b28230",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.15,
        "x": 0.08,
        "y": 0.14
      },
      "kind": "title",
      "text": "Offshore wind",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "79736e92-2699-4e68-9e0f-f0d9e07bd211",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "92c08f0d-655a-435d-806d-60a049556e41",
      "evidence": "The slide presents information in a list format, detailing developments in the hydro power sector and offshore wind.",
      "confidence": 0.8
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}