  "docId": "019dd923-5de0-76bd-a169-e8cb514deaa0",
  "docSlug": "b1f83db492a577cb",
  "documentTitle": "Turkey power generation evolution and top 100 players by capacity",
  "authorId": "Kearney",
  "authorName": "Kearney",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 8,
  "pageCount": 16,
  "prevPage": 7,
  "nextPage": 9,
  "slideType": "appendix_methodology",
  "function": "summarize",
  "density": "balanced",
  "nDataPoints": 0,
  "notes": null,
  "elementsJson": [
    "numbered_list",
    "photo"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a169-e8cb514deaa0/8",
  "deckHref": "/decks/019dd923-5de0-76bd-a169-e8cb514deaa0",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a169-e8cb514deaa0.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a169-e8cb514deaa0#slide-8",
  "components": [
    {
      "bbox": {
        "h": 0.25,
        "w": 0.38,
        "x": 0.62,
        "y": 0.75
      },
      "kind": "image",
      "text": "Wind turbines",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a6e1d1cf-c639-4d6e-b6d2-859b4c772376",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.85,
        "w": 0.7,
        "x": 0.25,
        "y": 0.05
      },
      "kind": "list",
      "text": "1. Power generation capacity data was compiled as of 31.12.2022. 2. Turkey's Energy Market Regulatory Authority (EPDK/EMRA) data was used as a basis in data compilation. 3. Only power plants with a license issued by EPDK were considered in the study. 4. Only power plants resided within Turkish borders were included in the study. 5. Power plants that are currently in the construction stage were excluded from the study or partially included. 6. Allocation of power generation capacity to groups/companies was completed based on equity stake. 7. Consolidation of power plants to groups/companies was completed based on information gathered from groups/companies, their websites, and from general news sources.",
      "attrs": null,
      "subkind": "numbered",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a2e493fb-8d6e-4fe8-9f15-c304358b85d8",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.2,
        "x": 0.03,
        "y": 0.05
      },
      "kind": "title",
      "text": "Methodology of the study",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "96803e41-81cc-4e46-83af-3a70d0747a44",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}