{
  "docId": "019dd923-5de0-76bd-a169-4d41740ce8bb",
  "docSlug": "78bb0ae4454c2778",
  "documentTitle": "Socio-economic case for deepening solar PV deployment in Nigeria",
  "authorId": "BCG",
  "authorName": "BCG",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 11,
  "pageCount": 87,
  "prevPage": 10,
  "nextPage": 12,
  "slideType": "appendix_data",
  "function": "diagnose",
  "density": "dense",
  "nDataPoints": 13,
  "notes": "The slide uses a bar chart for regional comparison and a stacked bar chart for reliability metrics in Nigeria.",
  "elementsJson": [
    "headline_text",
    "bar_chart_vertical",
    "bar_chart_stacked"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a169-4d41740ce8bb/11",
  "deckHref": "/decks/019dd923-5de0-76bd-a169-4d41740ce8bb",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a169-4d41740ce8bb.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a169-4d41740ce8bb#slide-11",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "Nigeria has one of the lowest populations with access to electricity ... and for those with access in the country, only 17% get reliable electricity",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-fefb-728e-ad98-4ee716f3a10b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.5,
        "w": 0.4,
        "x": 0.55,
        "y": 0.35
      },
      "kind": "chart",
      "text": "Reliability of grid electricity in connected HH (%)",
      "attrs": null,
      "subkind": "bar-stacked",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "cc2ddcab-9c6a-4a55-aed7-402d9783aca6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.5,
        "w": 0.45,
        "x": 0.05,
        "y": 0.35
      },
      "kind": "chart",
      "text": "Access to electricity (% of population)",
      "attrs": null,
      "subkind": "bar-vertical",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9515b920-ec24-4d89-99e1-09f8ca10ab9a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Access to electricity: 55%",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-fefb-728e-ad98-53418ac7e014",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.8,
        "x": 0.05,
        "y": 0.88
      },
      "kind": "source-note",
      "text": "Source: World Bank Global Electrification Database from \"Tracking SDG 7: The Energy Progress Report\" led jointly by the custodian agencies: the International Energy Agency (IEA), the International Renewable Energy Agency (IRENA), the United Nations Statistics Division (UNSD), the World Bank and the World Health Organization (WHO).; Afrobarometer 2014/2015 Survey Data",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "633c8849-9b86-448a-abed-b8e9fd8a2883",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.9,
        "x": 0.05,
        "y": 0.08
      },
      "kind": "title",
      "text": "Inadequate and unreliable grid supply: Most households in Nigeria do not have access to adequate & reliable grid power supply resulting in dependence on alternative sources of electricity",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5cd8e1e6-d24c-45ab-80ff-d6cd4a886445",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Loss Aversion",
      "slug": "loss-aversion",
      "agent": "Storyteller",
      "layer": "block",
      "matchId": "019dd95a-14f5-72a3-8b8d-065a85d514a3",
      "evidence": "Frames the pain: lowest electricity access, unreliable supply",
      "confidence": 70
    },
    {
      "name": "Action Titles",
      "slug": "action-titles",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "019dd95a-14f5-72a3-8b8c-fc11d005a18a",
      "evidence": "Title quotes the insight: 'Most households... do not have access to adequate & reliable grid power'",
      "confidence": 90
    },
    {
      "name": "Before-After-Bridge",
      "slug": "before-after-bridge",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "c2dd3c8b-e6c9-48f6-ac0b-1eb6d40740d9",
      "evidence": "The slide presents a comparison of access to electricity and reliability of grid electricity.",
      "confidence": 0.7
    },
    {
      "name": "Chart Selection Guide",
      "slug": "chart-selection-guide",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "8a56637b-fc35-4f73-b6c9-6985836b7759",
      "evidence": "The slide uses bar-stacked and bar-vertical charts to present data.",
      "confidence": 0.7
    },
    {
      "name": "Concrete Language",
      "slug": "concrete-language",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "019dd95a-14f5-72a3-8b8d-002db7c42589",
      "evidence": "Callout: 'only 17% get reliable electricity'",
      "confidence": 80
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 18,
      "from": 11,
      "beatId": "019dd95a-0702-74a3-87e0-7b54943487b8",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Problem & Complication",
      "beatSlug": "consultants-gambit-problem-complication",
      "evidence": "Inadequate grid (p11), underpenetration vs peers (p17), 5-8GW gap (p18)",
      "position": 2,
      "confidence": 92,
      "parentBeatName": "Complication",
      "parentBeatSlug": "complication"
    },
    {
      "to": 18,
      "from": 11,
      "beatId": "019dd95a-0702-74a3-87e0-892d32dc5fc2",
      "arcName": "Problem-Agitate-Solution",
      "arcSlug": "problem-agitate-solution",
      "beatName": "Problem (Identify pain)",
      "beatSlug": "problem-agitate-solution-problem-identify-pain",
      "evidence": "Grid inadequacy and underpenetration framed early",
      "position": 1,
      "confidence": 65,
      "parentBeatName": "Complication",
      "parentBeatSlug": "complication"
    }
  ],
  "loops": [
    {
      "to": 16,
      "from": 11,
      "name": "Mece Breakdown",
      "slug": "40-mece-breakdown",
      "bestFor": "Problem structuring, ensuring completeness, strategic analysis",
      "matchId": "019dd95a-088b-72c8-b7e7-80b98c960ffd",
      "evidence": "Each slide is a separate driver: grid gap, policy, cleaner energy, cost, investment, business models",
      "position": 3,
      "objective": "Lay out 6 distinct demand+supply drivers",
      "structure": "The Whole -> Category A (distinct) -> Category B (distinct) -> Category C (distinct) -> Complete Coverage",
      "confidence": 82,
      "description": "Divide a complex topic into mutually exclusive, collectively exhaustive categories"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}