  "docId": "019dd923-5de0-76bd-a168-516ee1323c41",
  "docSlug": "5f83c7bb8eeb6521",
  "documentTitle": "SOUTHEAST ASIA’S GREEN ECONOMY 2024",
  "authorId": "Bain",
  "authorName": "Bain",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.914,
  "pageNumber": 122,
  "pageCount": 171,
  "prevPage": 121,
  "nextPage": 123,
  "slideType": "case_study",
  "function": "illustrate_case",
  "density": "overcrowded",
  "nDataPoints": 3,
  "notes": "The slide uses a comparison chart to show the gap between renewable potential and current capacity, followed by a structured case study and next steps.",
  "elementsJson": [
    "headline_text",
    "bar_chart_horizontal",
    "callout_box",
    "bullet_list"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a168-516ee1323c41/122",
  "deckHref": "/decks/019dd923-5de0-76bd-a168-516ee1323c41",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a168-516ee1323c41.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a168-516ee1323c41#slide-122",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "Leveraging grid interconnections from the LTMS-PIP project, Singapore imports up to 100 MW renewable energy, equivalent to 1.5% of SG's peak electricity demand, from Laos since 2022",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-b48b-703a-a635-2db957cdd974",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.22,
        "w": 0.72,
        "x": 0.25,
        "y": 0.19
      },
      "kind": "chart",
      "text": "SEA RE technical potential vs. expected total power plant capacity (GW)",
      "attrs": null,
      "subkind": "bar-vertical",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "883d7697-5f15-42c8-994f-f54e78aefee3",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.11,
        "w": 0.69,
        "x": 0.28,
        "y": 0.61
      },
      "kind": "list",
      "text": "ASEAN laid out priority bilateral interconnection projects and is piloting first multilateral trade pilot projects. Leveraging grid interconnections from the LTMS-PIP project, Singapore imports up to 100 MW renewable energy, equivalent to 1.5% of SG's peak electricity demand, from Laos since 2022",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "28f39ced-91ff-43c7-a4d9-ef156a6d682e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.12,
        "w": 0.72,
        "x": 0.25,
        "y": 0.74
      },
      "kind": "list",
      "text": "Legal regulatory framework: Reflection of support in country policies like the roadmap will build endorsement and confidence. Private sector engagement: Potential to involve private financial investors will enhance bankability of grid projects. Standards: Leverage existing GMS grid code to develop ASEAN-wide interoperability standards",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e008426d-9b9f-4817-b1d0-cb58d89145ce",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.07,
        "w": 0.72,
        "x": 0.25,
        "y": 0.44
      },
      "kind": "list",
      "text": "Slow deployment of grid infrastructure to integrate RE; Fossil fuel dependency despite high environment costs; Mismatch of RE demand and supply due to geog. dispersion",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e5a82e63-706f-4dee-8186-298af79b534d",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Renewable energy technical potential: 17,230",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-b48b-703a-a635-30542b06e238",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.22,
        "x": 0.04,
        "y": 0.63
      },
      "kind": "paragraph",
      "text": "Lao PDR-Thailand-Malaysia-Singapore Power Integration Project (LTMS-PIP)",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1db52687-de39-4464-8cb9-304b3fe28256",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.6,
        "x": 0.03,
        "y": 0.91
      },
      "kind": "source-note",
      "text": "Notes: 1) Renewable energy technical potential factors... 3) Greater Mekong Subregion | Sources: Expert interview; Lit. search; Bain analysis",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1d6bcd7a-1257-4ab2-a8f7-8c165255ca36",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.07,
        "w": 0.95,
        "x": 0.03,
        "y": 0.07
      },
      "kind": "title",
      "text": "Regional cross-border grid: A regional grid can unlock even greater renewables potential while helping reduce intermittency risks in any renewables transition",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c7aa49aa-ae4e-49c9-ab40-24f46042f745",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "Renewable energy technical potential",
      "numberRaw": "17,230",
      "numberKind": "plain",
      "actionTitle": "Regional cross-border grid: A regional grid can unlock even greater renewables potential while helping reduce intermittency risks in any renewables transition",
      "calloutText": "Leveraging grid interconnections from the LTMS-PIP project, Singapore imports up to 100 MW renewable energy, equivalent to 1.5% of SG's peak electricity demand, from Laos since 2022",
      "numberScale": null,
      "numberValue": 17.23,
      "metricFamily": "cost_savings",
      "numberCurrency": null
    }
  ],
  "tools": [
    {
      "name": "Action Titles",
      "slug": "action-titles",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "019dd95a-1b09-7403-ac4e-b2a556ef15ed",
      "evidence": "'Regional cross-border grid' with LTMS-PIP example, 100MW imports.",
      "confidence": 88
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 125,
      "from": 76,
      "beatId": "019dd95a-07a7-7579-bd63-b690db8c4027",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Evidence & Proof",
      "beatSlug": "consultants-gambit-evidence-proof",
      "evidence": "Deep-dives on each accelerator with case studies (EU taxonomy, IRA, ACEN, Pentagreen, Bayfront)",
      "position": 4,
      "confidence": 92,
      "parentBeatName": "Evidence",
      "parentBeatSlug": "evidence"
    },
    {
      "to": 125,
      "from": 46,
      "beatId": "019dd95a-07a7-7579-bd63-c066ab667052",
      "arcName": "The Triple Take",
      "arcSlug": "triple-take",
      "beatName": "The Implications (So What)",
      "beatSlug": "triple-take-the-implications-so-what",
      "evidence": "What ideas/accelerators are needed to close the gap",
      "position": 2,
      "confidence": 70,
      "parentBeatName": "Reflection",
      "parentBeatSlug": "reflection"
    }
  ],
  "loops": [
    {
      "to": 125,
      "from": 121,
      "name": "Precedent",
      "slug": "09-precedent",
      "bestFor": "Risk mitigation, strategy validation, building confidence in new approaches",
      "matchId": "019dd95a-08f8-7619-ac2d-10fbf76dea33",
      "evidence": "p.122 LTMS-PIP grid; p.123 regional carbon market; p.124 Singapore-Asia Taxonomy.",
      "position": 14,
      "objective": "Demonstrate regional collaboration via LTMS grid, ASEAN taxonomy, carbon-market cases",
      "structure": "The Precedent Case -> What Happened -> The Parallel -> Applied Learning",
      "confidence": 72,
      "description": "Use historical or external examples to validate your approach"
    }
  ],