{
  "docId": "019dd923-5de0-76bd-a168-0d72310b9b69",
  "docSlug": "c58f0893b3365973",
  "documentTitle": "Forecasting a Realistic Electricity Infrastructure Buildout for Medium- &amp; Heavy-Duty Battery Electric Vehicles",
  "authorId": "RolandBerger",
  "authorName": "Roland Berger",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 4,
  "pageCount": 16,
  "prevPage": 3,
  "nextPage": 5,
  "slideType": "market_sizing",
  "function": "size_opportunity",
  "density": "dense",
  "nDataPoints": 8,
  "notes": "The slide uses a structured table to decompose the total investment cost across different charging segments.",
  "elementsJson": [
    "headline_text",
    "numbered_list",
    "paragraph",
    "callout_box",
    "data_table"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a168-0d72310b9b69/4",
  "deckHref": "/decks/019dd923-5de0-76bd-a168-0d72310b9b69",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a168-0d72310b9b69.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a168-0d72310b9b69#slide-4",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "To electrify all MDHD vehicles, fleets and charge point operators will need to invest USD 620 billion into chargers, site infrastructure, and utility service costs",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-e590-72ba-a102-b89e2937cf37",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.1,
        "x": 0.75,
        "y": 0.55
      },
      "kind": "metric",
      "text": "496 B",
      "attrs": null,
      "subkind": "big-number",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0ba35873-16c1-483b-8e67-b126c728f3d1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.1,
        "x": 0.75,
        "y": 0.78
      },
      "kind": "metric",
      "text": "126 B",
      "attrs": null,
      "subkind": "big-number",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6ebd7b1c-e318-48c9-ae7a-8c9717251366",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Total investment: $620B",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-e590-72ba-a102-be1709d0dbef",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.65,
        "w": 0.9,
        "x": 0.03,
        "y": 0.25
      },
      "kind": "table",
      "text": "Investment breakdown by segment and technology type",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8551ff5d-7f39-42bb-ae68-71bea853bd52",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.9,
        "x": 0.03,
        "y": 0.08
      },
      "kind": "title",
      "text": "To electrify all MDHD vehicles, fleets and charge point operators will need to invest USD 620 billion into chargers, site infrastructure, and utility service costs",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0b574867-da3f-41ce-9258-abc676c9601b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.2,
        "x": 0.03,
        "y": 0.03
      },
      "kind": "title",
      "text": "Charger infrastructure investment",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "59243644-2151-4331-9144-df45457344ed",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [
    {
      "name": "market-segmentation-pyramid",
      "slug": null,
      "matchId": "f1eb225b-acd5-4da3-819c-732751440d99",
      "evidence": "The slide segments the MDHD market into four distinct use cases (local/heavy duty) and maps them to infrastructure investment needs.",
      "confidence": 0.8
    }
  ],
  "arcBeats": [
    {
      "to": 7,
      "from": 4,
      "beatId": "5150b8e2-7dde-4a6a-9a95-4a44e672f05c",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Problem & Complication",
      "beatSlug": "consultants-gambit-problem-complication",
      "evidence": "The document discusses the challenges and complications of electrifying MDHD vehicles, including high costs and utilization risk",
      "position": 1,
      "confidence": 0.8,
      "parentBeatName": "Complication",
      "parentBeatSlug": "complication"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}