{
  "docId": "019dd923-5de0-76bd-a167-f5338fdd2b45",
  "docSlug": "1dd3146ae2ac043f",
  "documentTitle": "RAIL FREIGHT IN CENTRAL ASIA AND MIDDLE EAST",
  "authorId": "RolandBerger",
  "authorName": "Roland Berger",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.777,
  "pageNumber": 79,
  "pageCount": 89,
  "prevPage": 78,
  "nextPage": 80,
  "slideType": "geographic_map",
  "function": "present_solution",
  "density": "balanced",
  "nDataPoints": 0,
  "notes": "The slide uses a map to illustrate infrastructure development priorities across the Middle East.",
  "elementsJson": [
    "map",
    "numbered_list"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a167-f5338fdd2b45/79",
  "deckHref": "/decks/019dd923-5de0-76bd-a167-f5338fdd2b45",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a167-f5338fdd2b45.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-f5338fdd2b45#slide-79",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "Key areas of network development include the completion of the GCC rail connection, East-West railway network for Saudi-Arabia, new construction of Jordan rail network, rebuilding of Iraq rail network, and new construction of Oman rail network.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-dfa5-7563-a138-aa3facdd4ede",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.7,
        "w": 0.6,
        "x": 0.07,
        "y": 0.2
      },
      "kind": "image",
      "text": "Middle East target state rail freight network map",
      "attrs": null,
      "subkind": "map",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e6b79cb5-b339-4918-a21e-cbe826f21cc9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.6,
        "x": 0.07,
        "y": 0.9
      },
      "kind": "legend",
      "text": "Planned line, Existing line, Limited services, Port, Railway border crossing, Industry hub, Track gauge 1,435 mm, 1,050 mm",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a1232bf4-c8fb-4d32-89e7-4f384d20c7f0",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.65,
        "w": 0.25,
        "x": 0.7,
        "y": 0.25
      },
      "kind": "list",
      "text": "1. Completion of GCC rail connection; 2. East-West railway network for Saudi-Arabia; 3. New construction of Jordan rail network; 4. Rebuilding of Iraq rail network and connection to Iran; 5. New construction of Oman rail network",
      "attrs": null,
      "subkind": "numbered",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c77e4da4-ce6a-4cf9-b1d1-6ccc7e4a0130",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.85,
        "x": 0.07,
        "y": 0.05
      },
      "kind": "title",
      "text": "Target state ME network connects rail to major North-South and East-West trade lanes",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ac50468e-559b-416a-9721-d998ad288303",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "NxN matrix",
      "slug": "matrix-nxn",
      "agent": null,
      "layer": "slide",
      "matchId": "bb9c3249-0236-491f-9950-499f48c9e145",
      "evidence": "legend: Planned line, Existing line, Limited services, Port, Railway border crossing, Industry hub, Track gauge 1,435 mm, 1,050 mm",
      "confidence": 0.7
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [
    {
      "to": 82,
      "from": 78,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "bea31fb1-d11e-47c2-a5a4-354e66570e04",
      "evidence": "The document highlights the potential benefits of developing rail freight in Middle East",
      "position": 2,
      "objective": "What are the consequences of not developing rail freight in Middle East?",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.6,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}