{
  "docId": "019dd923-5de0-76bd-a167-ba8723c94f62",
  "docSlug": "20e6af78e33e3047",
  "documentTitle": "Blueprint for success",
  "authorId": "Accenture",
  "authorName": "Accenture",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 13,
  "pageCount": 34,
  "prevPage": 12,
  "nextPage": 14,
  "slideType": "comparison_table",
  "function": "compare_options",
  "density": "dense",
  "nDataPoints": 33,
  "notes": "The table uses a dot-based legend to represent High, Medium, and Low impact levels.",
  "elementsJson": [
    "action_title",
    "paragraph",
    "heatmap",
    "comparison_table",
    "footnote"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a167-ba8723c94f62/13",
  "deckHref": "/decks/019dd923-5de0-76bd-a167-ba8723c94f62",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a167-ba8723c94f62.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a167-ba8723c94f62#slide-13",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "Methods like Integrated Project Delivery (IPD) and Progressive Design-Build are effective alternatives to more traditional approaches - such as design, bid and build - reducing cost variance by around 10%.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-a672-7739-9cdd-e1a13314937f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.25,
        "x": 0.39,
        "y": 0.78
      },
      "kind": "legend",
      "text": "High impact, Medium impact, Low impact",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "eaae441a-f211-4f74-a14a-4e1964eeea48",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Capability impact rating: 13",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-a672-7739-9cdd-e76c72f03be7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.3,
        "x": 0.07,
        "y": 0.33
      },
      "kind": "paragraph",
      "text": "Methods like Integrated Project Delivery (IPD) and Progressive Design-Build are effective alternatives to more traditional approaches - such as design, bid and build - reducing cost variance by around 10%.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "392a4700-b3fc-41de-b5ae-b7111f0db51b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.4,
        "x": 0.36,
        "y": 0.83
      },
      "kind": "source-note",
      "text": "Source: Accenture capital projects executive survey 2024. * Either owner, operator, or EPC company",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "cdc5e2be-9a73-4b2e-9919-990a0ed5cbd6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.75,
        "w": 0.57,
        "x": 0.36,
        "y": 0.13
      },
      "kind": "table",
      "text": "Critical capabilities for project planning and governance table",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bf865fa6-2736-44be-8d16-f312a85c9b58",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.3,
        "x": 0.07,
        "y": 0.12
      },
      "kind": "title",
      "text": "Planning sufficiently is easier to achieve with collaborative project delivery methods and by developing specific high impact capabilities that lead to stronger outcomes.",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b5a7b89c-4214-4b2c-b42b-be4eee87f2ad",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "Capability impact rating",
      "numberRaw": "13",
      "numberKind": "plain",
      "actionTitle": "Planning sufficiently is easier to achieve with collaborative project delivery methods and by developing specific high impact capabilities that lead to stronger outcomes.",
      "calloutText": "Methods like Integrated Project Delivery (IPD) and Progressive Design-Build are effective alternatives to more traditional approaches - such as design, bid and build - reducing cost variance by around 10%.",
      "numberScale": null,
      "numberValue": 13,
      "metricFamily": "index_score",
      "numberCurrency": null
    }
  ],
  "tools": [
    {
      "name": "Action Titles",
      "slug": "action-titles",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "019dd95a-0bbb-77da-b1d9-113d7936f2ca",
      "evidence": "Title states the so-what that planning + capabilities yield stronger outcomes",
      "confidence": 80
    },
    {
      "name": "Chart Selection Guide",
      "slug": "chart-selection-guide",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019dd95a-0bbb-77da-b1d9-1704340ae302",
      "evidence": "Capability x project-type matrix with dot intensity is appropriate for ordinal cross-tab",
      "confidence": 85
    },
    {
      "name": "Color Strategy",
      "slug": "color-strategy",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019dd95a-0bbb-77da-b1d9-18478d204d85",
      "evidence": "Purple intensity encodes High/Medium/Low impact with explicit legend",
      "confidence": 85
    },
    {
      "name": "Gestalt Principles",
      "slug": "gestalt-principles",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019dd95a-0bbb-77da-b1d9-234ec3c86ea2",
      "evidence": "Capability rows aligned and similarly styled invite row-wise comparison",
      "confidence": 70
    },
    {
      "name": "Small Multiples",
      "slug": "small-multiples",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019dd95a-0bbb-77da-b1d9-1cdd896e118c",
      "evidence": "Three project-type columns (Greenfield/Brownfield/Decommissioning) repeat across capabilities",
      "confidence": 80
    }
  ],
  "frameworks": [
    {
      "name": "Capability Impact Heatmap",
      "slug": null,
      "matchId": "019dd95a-1ca5-70bb-bb9b-6d95018c69f8",
      "evidence": "Capabilities x project-type with High/Medium/Low impact dots",
      "confidence": 75
    }
  ],
  "arcBeats": [
    {
      "to": 28,
      "from": 12,
      "beatId": "019dd95a-0680-7418-8209-598a48b782f7",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Evidence & Proof",
      "beatSlug": "consultants-gambit-evidence-proof",
      "evidence": "Four parallel deep-dives: recommendation + heatmap + quote + case study each",
      "position": 4,
      "confidence": 90,
      "parentBeatName": "Evidence",
      "parentBeatSlug": "evidence"
    },
    {
      "to": 28,
      "from": 10,
      "beatId": "019dd95a-0680-7418-8209-670e9dc1c065",
      "arcName": "The Triple Take",
      "arcSlug": "triple-take",
      "beatName": "The Implications (So What)",
      "beatSlug": "triple-take-the-implications-so-what",
      "evidence": "Four action areas with capabilities and case studies",
      "position": 2,
      "confidence": 55,
      "parentBeatName": "Reflection",
      "parentBeatSlug": "reflection"
    }
  ],
  "loops": [
    {
      "to": 16,
      "from": 12,
      "name": "Aha Moment",
      "slug": "03-aha-moment",
      "bestFor": "Data-heavy sections, research findings, analytical arguments",
      "matchId": "019dd95a-07fd-712f-b773-032473cf1fe0",
      "evidence": "Recommendation -> capability heatmap -> expert quote -> AI 40% stat -> $50B PMIS case study",
      "position": 5,
      "objective": "Prove action area 1 (Turn insight into foresight)",
      "structure": "The Problem/Question -> What the Data Shows -> The Insight",
      "confidence": 75,
      "description": "Establish a tension, present data, then deliver the insight that changes everything"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}