{
  "docId": "019dd923-5de0-76bd-a165-e9e5329fc780",
  "docSlug": "f8dd05e81e5af476",
  "documentTitle": "McKinsey NJ Military Affairs Veterans",
  "authorId": "proposals",
  "authorName": "McKinsey",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "portrait",
  "aspectRatio": 0.707,
  "pageNumber": 99,
  "pageCount": 233,
  "prevPage": 98,
  "nextPage": 100,
  "slideType": "appendix_disclosure",
  "function": "summarize",
  "density": "overcrowded",
  "nDataPoints": 0,
  "notes": "Page 51 of a regulatory or compliance document.",
  "elementsJson": [
    "paragraph",
    "numbered_list"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a165-e9e5329fc780/99",
  "deckHref": "/decks/019dd923-5de0-76bd-a165-e9e5329fc780",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a165-e9e5329fc780.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a165-e9e5329fc780#slide-99",
  "components": [
    {
      "bbox": {
        "h": 0.09,
        "w": 0.75,
        "x": 0.13,
        "y": 0.81
      },
      "kind": "list",
      "text": "Section A. Contract Provisions for Administrative Requirements. 1. Remedies. In any contract under NGB CA awards for an amount more than the simplified acquisition threshold, you must provide for administrative, contractual, or legal remedies, including any appropriate sanctions and penalties, when the contractor violates or breaches the contract terms.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0d636f1e-5ef8-414c-ab93-17c1e83ae753",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.75,
        "x": 0.13,
        "y": 0.5
      },
      "kind": "list",
      "text": "Section I. Domestic Preferences for Procurements. As appropriate and to the extent consistent with law, you should, to the greatest extent practicable under NGB CA awards, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). This must be included in all subawards including all contracts and purchase orders for work or products under NGB CA awards.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "15e6f671-7744-4446-bfef-4406e1692614",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.75,
        "x": 0.13,
        "y": 0.25
      },
      "kind": "list",
      "text": "Section G. Procurement of Recovered Materials. If you are a political subdivision of a state, you must comply with the Resource Conservation and Recovery Act requirements described in OMB guidance in 2 CFR 200.323.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "20488741-33e7-4126-a15c-d659b26c1e94",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.75,
        "x": 0.13,
        "y": 0.15
      },
      "kind": "list",
      "text": "Section F. Contract Provisions. You must include provisions in your procurement transactions under NGB CA awards to require the contractors' compliance with the requirements of PROC Article III, as applicable.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a0637682-f0ae-415a-9553-3e79278a1506",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.75,
        "x": 0.13,
        "y": 0.68
      },
      "kind": "list",
      "text": "Section J. Bonding Requirements. RESERVED - Only applicable if provided in award-specific terms and conditions.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b259befc-4333-41a0-8092-45e6da5cb50a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.12,
        "w": 0.75,
        "x": 0.13,
        "y": 0.35
      },
      "kind": "list",
      "text": "Section H. Review of Procurement Documents. Upon our request, you must make available: a. Technical specifications on proposed procurement transactions, as described in 2 CFR 200.325(a). b. Pre-procurement documents for our review, as described in 2 CFR 200.325(b) unless you are exempt from that requirement under 2 CFR 200.325(c).",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b759c5dd-4677-4426-8adf-000f2d3b5293",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.75,
        "x": 0.13,
        "y": 0.08
      },
      "kind": "paragraph",
      "text": "When awarding a procurement transaction under NGB CA awards, you must follow the procedures related to cost and price that are described in OMB guidance in 2 CFR 200.324, using the applicable cost principles specified in FMS Article III.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a76f3b1e-4b60-4024-bf54-910bf5d19e71",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.75,
        "x": 0.13,
        "y": 0.77
      },
      "kind": "title",
      "text": "PROC Article III. Contract Provisions for Recipient Procurements.",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5ae769a6-a331-4072-915e-d5e84a9b8ed5",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [],
  "loops": [
    {
      "to": 140,
      "from": 41,
      "name": "Logic Chain",
      "slug": "01-logic-chain",
      "bestFor": "Skeptical audiences, controversial recommendations, rigorous analysis",
      "matchId": "e389f8c3-2b60-4e9c-8925-526d4c411fde",
      "evidence": "slides 41-140 provide detailed project information",
      "position": 0,
      "objective": "justify the project scope and timeline",
      "structure": "Premise 1 (Accepted truth) -> Premise 2 (Observed fact) -> Therefore... (Inevitable conclusion)",
      "confidence": 0.6,
      "description": "Build an airtight chain of logic where each premise leads inevitably to the conclusion"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}