{
  "docId": "019dd923-5de0-76bd-a165-578b9862173f",
  "docSlug": "091122f6e046fa86",
  "documentTitle": "Rail industry cost and revenue sharing (2011)",
  "authorId": "misc",
  "authorName": "L.E.K.",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.414,
  "pageNumber": 50,
  "pageCount": 170,
  "prevPage": 49,
  "nextPage": 51,
  "slideType": "data_table",
  "function": "analyze_data",
  "density": "dense",
  "nDataPoints": 20,
  "notes": "The chart uses bubble size to represent total train kms. A vertical line at 70% highlights the threshold mentioned in the title.",
  "elementsJson": [
    "headline_text",
    "bubble_chart",
    "footnote"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a165-578b9862173f/50",
  "deckHref": "/decks/019dd923-5de0-76bd-a165-578b9862173f",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a165-578b9862173f.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a165-578b9862173f#slide-50",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "Nine TOCs would have at least a 70 percent share of the train km of their primary NR operating route if NR implemented the four changes to its current route boundaries.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-edab-7238-a54e-d3ad39ba9dde",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.6,
        "w": 0.75,
        "x": 0.1,
        "y": 0.25
      },
      "kind": "chart",
      "text": "Operator vs. primary operating route",
      "attrs": null,
      "subkind": "bubble",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8430bce1-c1c2-4b43-b293-ced0cc9800d7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.5,
        "x": 0.1,
        "y": 0.88
      },
      "kind": "disclaimer",
      "text": "Note: * Train kms are allocated based on mapping of operating route to strategic route section by track km. Source: NR; L.E.K. analysis. ORR/ATOC/Network Rail. Rail industry cost and revenue sharing.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "2a909b2a-58db-416e-b585-6b837085d7e9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.12,
        "x": 0.76,
        "y": 0.65
      },
      "kind": "legend",
      "text": "Key: 20m train kms",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6ac23016-54f0-4dc5-a4c3-1f3a39fc4171",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Share of total train kms on primary route: 70%",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-edab-7238-a54e-d47aca06210e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.8,
        "x": 0.1,
        "y": 0.13
      },
      "kind": "title",
      "text": "2 – Geography: Nine TOCs would have at least a 70 percent share of the train km of their primary NR operating route if NR implemented the four changes to its current route boundaries",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "625c00cc-37ea-4be5-a202-32b18a3ff478",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Chart Selection Guide",
      "slug": "chart-selection-guide",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "a0617cd6-96c2-4e4c-ad84-89c9b5867427",
      "evidence": "chart/bubble: Operator vs. primary operating route",
      "confidence": 0.6
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 60,
      "from": 41,
      "beatId": "53cbee0d-035e-431c-8c6e-4d3f99416443",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Evidence & Proof",
      "beatSlug": "consultants-gambit-evidence-proof",
      "evidence": "The document provides data tables and analysis to support L.E.K.'s recommendation.",
      "position": 3,
      "confidence": 0.8,
      "parentBeatName": "Evidence",
      "parentBeatSlug": "evidence"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}