  "docId": "019dd923-5de0-76bd-a165-315170542edc",
  "docSlug": "99caa4b609d77eb8",
  "documentTitle": "Lazards Lcoeplus",
  "authorId": "misc",
  "authorName": "Lazard",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.294,
  "pageNumber": 50,
  "pageCount": 57,
  "prevPage": 49,
  "nextPage": 51,
  "slideType": "appendix_data",
  "function": "analyze_data",
  "density": "balanced",
  "nDataPoints": 48,
  "notes": "This is a continuation slide from a Lazard LCOE report, focusing on operating assets.",
  "elementsJson": [
    "data_table"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a165-315170542edc/50",
  "deckHref": "/decks/019dd923-5de0-76bd-a165-315170542edc",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a165-315170542edc.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a165-315170542edc#slide-50",
  "components": [
    {
      "bbox": null,
      "kind": "metric",
      "text": "Levelized Cost of Energy",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-f954-77ed-ab40-a38b330f5e6b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.6,
        "x": 0.135,
        "y": 0.935
      },
      "kind": "source-note",
      "text": "Source: Lazard and Roland Berger estimates and publicly available information. (1) Includes capitalized financing costs during construction for generation types with over 12 months of construction time.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e5f1943b-444d-4970-b202-cbd92b44e4e9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.6,
        "w": 0.91,
        "x": 0.045,
        "y": 0.25
      },
      "kind": "table",
      "text": "Table showing assumptions for Nuclear, Coal, and Gas Combined Cycle across various metrics like O&M, Heat Rate, Capacity Factor, Fuel Price, and LCOE.",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "eebb3cc9-c6db-4125-91be-497c2373ff55",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.58,
        "x": 0.045,
        "y": 0.138
      },
      "kind": "title",
      "text": "Levelized Cost of Energy—Key Assumptions (cont'd)",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9dfd19f6-3bc7-45b1-b05e-4a5ac4e9ccae",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Table data",
      "slug": "table-data",
      "agent": null,
      "layer": "slide",
      "matchId": "e94367d3-5e8b-4be8-b2a9-3c2d773b7b55",
      "evidence": "Table/data: Table showing assumptions for Nuclear, Coal, and Gas Combined Cycle across various metrics like O&M, Heat Rate, Capacity Factor, Fuel Price, and LCOE.",
      "confidence": 0.9
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}