  "docId": "019dd923-5de0-76bd-a165-315170542edc",
  "docSlug": "99caa4b609d77eb8",
  "documentTitle": "Lazards Lcoeplus",
  "authorId": "misc",
  "authorName": "Lazard",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.294,
  "pageNumber": 49,
  "pageCount": 57,
  "prevPage": 48,
  "nextPage": 50,
  "slideType": "appendix_data",
  "function": "analyze_data",
  "density": "balanced",
  "nDataPoints": 64,
  "notes": "This is a data-heavy appendix slide from a Lazard LCOE report.",
  "elementsJson": [
    "data_table",
    "footnote"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a165-315170542edc/49",
  "deckHref": "/decks/019dd923-5de0-76bd-a165-315170542edc",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a165-315170542edc.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a165-315170542edc#slide-49",
  "components": [
    {
      "bbox": {
        "h": 0.08,
        "w": 0.91,
        "x": 0.045,
        "y": 0.88
      },
      "kind": "disclaimer",
      "text": "Source: Lazard and Roland Berger estimates and publicly available information. (1) Given the limited public and/or observable data set available for new-build nuclear projects... (2) High end incorporates 90% CCS... (3) Includes capitalized financing costs...",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "631ef624-428b-4186-8e80-e747c3c31080",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Levelized Cost of Energy",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-f954-77ed-ab40-63cb707f8642",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.6,
        "w": 0.91,
        "x": 0.045,
        "y": 0.25
      },
      "kind": "table",
      "text": "Table comparing Net Facility Output, Capital Costs, O&M, Heat Rate, Capacity Factor, Fuel Price, Construction Time, Facility Life, and LCOE for Gas Peaking, Nuclear, Coal, and Gas Combined Cycle.",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ab3dcf2d-a092-4107-9747-db67017014d9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.58,
        "x": 0.045,
        "y": 0.135
      },
      "kind": "title",
      "text": "Levelized Cost of Energy—Key Assumptions (cont'd)",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9aea17a0-b30c-4a3e-bf89-8dd5ffb66c48",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Table data",
      "slug": "table-data",
      "agent": null,
      "layer": "slide",
      "matchId": "95d111c5-3aa3-4b83-b557-c600fb44a946",
      "evidence": "Table/data: Table comparing Net Facility Output, Capital Costs, O&M, Heat Rate, Capacity Factor, Fuel Price, Construction Time, Facility Life, and LCOE for Gas Peaking, Nuclear, Coal, and Gas Combined Cycle.",
      "confidence": 0.9
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}