  "docId": "019dd923-5de0-76bd-a165-315170542edc",
  "docSlug": "99caa4b609d77eb8",
  "documentTitle": "Lazards Lcoeplus",
  "authorId": "misc",
  "authorName": "Lazard",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.294,
  "pageNumber": 48,
  "pageCount": 57,
  "prevPage": 47,
  "nextPage": 49,
  "slideType": "appendix_data",
  "function": "analyze_data",
  "density": "balanced",
  "nDataPoints": 64,
  "notes": "Part of Lazard's LCOE analysis series.",
  "elementsJson": [
    "data_table",
    "footnote"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a165-315170542edc/48",
  "deckHref": "/decks/019dd923-5de0-76bd-a165-315170542edc",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a165-315170542edc.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a165-315170542edc#slide-48",
  "components": [
    {
      "bbox": null,
      "kind": "metric",
      "text": "Levelized Cost of Energy",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-f954-77ed-ab40-3bd317cdaca3",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.65,
        "x": 0.045,
        "y": 0.92
      },
      "kind": "source-note",
      "text": "Source: Lazard and Roland Berger estimates and publicly available information. (1) Given the limited data set available for new-build geothermal projects, the LCOE presented herein represents Lazard's LCOE v15.0 results adjusted for inflation. (2) Includes capitalized financing costs during construction for generation types with over 12 months of construction time.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8e337aee-cd88-44b5-9d67-e279b03422f6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.55,
        "w": 0.91,
        "x": 0.045,
        "y": 0.275
      },
      "kind": "table",
      "text": "Table comparing Net Facility Output, Capital Costs, O&M, Capacity Factor, Construction Time, Facility Life, and LCOE across four energy technologies.",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "87d38038-a8f2-4d10-acb3-a56d0658309a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.58,
        "x": 0.045,
        "y": 0.135
      },
      "kind": "title",
      "text": "Levelized Cost of Energy—Key Assumptions (cont'd)",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6f7cb282-d337-430a-a03d-5f5226167dd9",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Table data",
      "slug": "table-data",
      "agent": null,
      "layer": "slide",
      "matchId": "b63d1d38-9ead-44c3-87db-621b5b394714",
      "evidence": "Table/data: Table comparing Net Facility Output, Capital Costs, O&M, Capacity Factor, Construction Time, Facility Life, and LCOE across four energy technologies.",
      "confidence": 0.9
    }
  ],