{
  "docId": "019dd923-5de0-76bd-a164-8c6fe4690bb7",
  "docSlug": "0ae6598f299dc1cd",
  "documentTitle": "Financing Sustainable Aviation Fuels (with Kearney)",
  "authorId": "WEF",
  "authorName": "Kearney",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "academic_think_tank",
  "sourceTypeLabel": "Academic / think tank",
  "presentationDate": null,
  "orientation": "portrait",
  "aspectRatio": 0.707,
  "pageNumber": 15,
  "pageCount": 44,
  "prevPage": 14,
  "nextPage": 16,
  "slideType": "roadmap",
  "function": "present_framework",
  "density": "dense",
  "nDataPoints": 12,
  "notes": "Includes a process diagram (timeline) and supporting text explaining factors influencing the project lifecycle.",
  "elementsJson": [
    "process_diagram",
    "data_table",
    "paragraph",
    "callout_box"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5de0-76bd-a164-8c6fe4690bb7/15",
  "deckHref": "/decks/019dd923-5de0-76bd-a164-8c6fe4690bb7",
  "deckJsonHref": "/decks/019dd923-5de0-76bd-a164-8c6fe4690bb7.json",
  "deckAnchorHref": "/decks/019dd923-5de0-76bd-a164-8c6fe4690bb7#slide-15",
  "components": [
    {
      "bbox": {
        "h": 0.15,
        "w": 0.16,
        "x": 0.06,
        "y": 0.54
      },
      "kind": "callout",
      "text": "To invest in new technology, investors will want to be reassured that the production pathway has the potential to be used safely in aircraft.",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f7a096ec-23e8-4f31-80f1-4507ffb10231",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.45,
        "w": 0.88,
        "x": 0.06,
        "y": 0.08
      },
      "kind": "diagram",
      "text": "Five-stage process flow from Conceptualization to Commissioning",
      "attrs": null,
      "subkind": "timeline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8b881e90-4f9a-4374-abc8-63a5bb060ab6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Project timeline: 24-36 months",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-e592-7177-ac5a-50412cfee79d",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.4,
        "w": 0.7,
        "x": 0.24,
        "y": 0.54
      },
      "kind": "paragraph",
      "text": "The overall timeline can vary significantly, influenced by several key factors, some of which include factors affecting CapEx requirements as discussed above: Technology readiness level, Location of the facility, Experience of the operator, External capital requirements.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "35d34fce-ae7f-4c30-9119-b981c697da62",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.5,
        "x": 0.06,
        "y": 0.48
      },
      "kind": "source-note",
      "text": "Note: FOAK = first-of-a-kind. Fully mature and operational plants are also included in this figure. Sources: Kearney analysis, expert interviews, S&P Global.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ff0eedc8-a7d3-4f14-b432-aa701eba8618",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.65,
        "x": 0.125,
        "y": 0.035
      },
      "kind": "title",
      "text": "FIGURE 6 | Project lifecycle of a greenfield SAF production facility",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f0d54b4d-d227-4097-a484-5d41d029866b",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [
    {
      "name": "timeline",
      "slug": null,
      "matchId": "ab52a30b-27cc-44da-a561-db47efbe2999",
      "evidence": "The slide presents a sequential five-stage process flow for a project lifecycle.",
      "confidence": 1
    }
  ],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}