{
  "docId": "019dd923-5ca1-7489-b639-093f3fd1ecfe",
  "docSlug": "5ee5a9db2750184a",
  "documentTitle": "Lebanon Economic Vision",
  "authorId": "McKinsey",
  "authorName": "McKinsey",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.333,
  "pageNumber": 1072,
  "pageCount": 1274,
  "prevPage": 1071,
  "nextPage": 1073,
  "slideType": "market_sizing",
  "function": "size_opportunity",
  "density": "dense",
  "nDataPoints": 4,
  "notes": "The chart uses a waterfall-like structure to show the components of infrastructure stock and investment requirements.",
  "elementsJson": [
    "headline_text",
    "bar_chart_horizontal",
    "callout_box"
  ],
  "metadataConfidence": 0.95,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b639-093f3fd1ecfe/1072",
  "deckHref": "/decks/019dd923-5ca1-7489-b639-093f3fd1ecfe",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b639-093f3fd1ecfe.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b639-093f3fd1ecfe#slide-1072",
  "components": [
    {
      "bbox": {
        "h": 0.6,
        "w": 0.22,
        "x": 0.75,
        "y": 0.3
      },
      "kind": "callout",
      "text": "Between 2018 and 2025 (Cycles 1, 2), CIP infrastructure spending is expected to be ~17.25 Bn USD, or ~2 Bn USD per year. However, the same period will require at least 32 Bn USD, equating to ~4 Bn USD per year (excluding overdue investments)",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "acabef3f-6a8f-43cc-9525-28539dfc74a6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "callout",
      "text": "However, the same period will require at least 32 Bn USD, equating to ~4 Bn USD per year (excluding overdue investments).",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-d3b9-7789-9908-326dccfc27e2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.6,
        "w": 0.6,
        "x": 0.04,
        "y": 0.32
      },
      "kind": "chart",
      "text": "Waterfall chart showing infrastructure stock components and investment requirements",
      "attrs": null,
      "subkind": "waterfall",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bd6aeef4-fda4-41fe-9e56-7f9c2ee85848",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "USD billion: 32 Bn USD",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-d3b9-7789-9908-377a25743095",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.2,
        "x": 0.02,
        "y": 0.96
      },
      "kind": "source-note",
      "text": "Source: CAS, PCM; Expert interviews",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8ac4baa5-2ae9-46bf-8242-2b910b1e5505",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.8,
        "x": 0.04,
        "y": 0.03
      },
      "kind": "title",
      "text": "Beyond CIP, a top-down assessment should be conducted to understand required annual investment in infrastructure",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "51ba45ce-f3b4-4089-9fac-5cb62fc1dce8",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "USD billion",
      "numberRaw": "32 Bn USD",
      "numberKind": "plain",
      "actionTitle": "Beyond CIP, a top-down assessment should be conducted to understand required annual investment in infrastructure",
      "calloutText": "However, the same period will require at least 32 Bn USD, equating to ~4 Bn USD per year (excluding overdue investments).",
      "numberScale": "b",
      "numberValue": 32,
      "metricFamily": "market_size",
      "numberCurrency": null
    }
  ],
  "tools": [
    {
      "name": "Chart Selection Guide",
      "slug": "chart-selection-guide",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "63ad03c1-7ae3-4c85-9369-ea516255b582",
      "evidence": "chart/waterfall: Waterfall chart showing infrastructure stock components and investment requirements",
      "confidence": 0.7
    }
  ],
  "frameworks": [
    {
      "name": "waterfall-chart",
      "slug": null,
      "matchId": "7799534f-ac4a-411c-bc41-f7aadd6006de",
      "evidence": "The slide uses a waterfall-style visualization to decompose the infrastructure stock and investment requirements.",
      "confidence": 0.9
    }
  ],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}