  "docId": "019dd923-5ca1-7489-b639-093f3fd1ecfe",
  "docSlug": "5ee5a9db2750184a",
  "documentTitle": "Lebanon Economic Vision",
  "authorId": "McKinsey",
  "authorName": "McKinsey",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.333,
  "pageNumber": 1066,
  "pageCount": 1274,
  "prevPage": 1065,
  "nextPage": 1067,
  "slideType": "recommendation",
  "function": "prioritize",
  "density": "overcrowded",
  "nDataPoints": 15,
  "notes": "The slide uses a stacked bar chart to visualize budget allocation and a list of specific project examples to illustrate the prioritization strategy.",
  "elementsJson": [
    "bullet_list",
    "bar_chart_stacked",
    "comparison_table"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b639-093f3fd1ecfe/1066",
  "deckHref": "/decks/019dd923-5ca1-7489-b639-093f3fd1ecfe",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b639-093f3fd1ecfe.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b639-093f3fd1ecfe#slide-1066",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "Thus, to ensure achievement of economic objectives, Lebanon should prioritize vision-relevant projects across several dimensions (including distribution of funds, allocation of resources, etc.)",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-d3b9-7789-9907-522565df9e5c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.9,
        "x": 0.05,
        "y": 0.45
      },
      "kind": "chart",
      "text": "CIP budget by direct relevance to economic vision, USD mn",
      "attrs": null,
      "subkind": "bar-stacked-100pct",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5a565e9f-d8a4-4c28-98c2-cb569fa29f5a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.75,
        "x": 0.2,
        "y": 0.95
      },
      "kind": "disclaimer",
      "text": "Note: Beyond vision relevance, several other criteria should be taken into consideration when prioritizing CIP projects (e.g. Social impact, feasibility, interdependencies, etc.)",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "42ac1e61-076f-4910-bf79-85a2800581ae",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.9,
        "x": 0.05,
        "y": 0.15
      },
      "kind": "list",
      "text": "The Capital Investment Plan’s ~270 projects will provided much-needed infrastructure spending to Lebanon, and every effort must be made to ensure successful implementation. Several projects are highly relevant to the economic growth generally, and to the economic vision more specifically. 11 projects (representing 15% of total CIP budget) are deemed to be vision-critical. Thus, to ensure achievement of economic objectives, Lebanon should prioritize vision-relevant projects across several dimensions (including distribution of funds, allocation of resources, etc.). Moreover, a number of additional vision-linked priority projects need to be added to the government’s agenda",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9e57c74c-bc1a-40bd-9677-5727d0b75884",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.9,
        "x": 0.05,
        "y": 0.7
      },
      "kind": "list",
      "text": "Top-priority CIP projects include: Core power projects, Expansion of Beirut airport, Tripoli port, Deployment of Fiber network, Industrial zones (incl. Tripoli SEZ). Additional (new) priority projects include: Industrial construction zone (among other additional industrial zones), Beirut knowledge hub park, Urban improvement and tourism zone development in Beirut, Sour, Byblos",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b48ec6d7-0832-4d79-8443-e85eff61f773",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "CIP budget: 22,939",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-d3b9-7789-9907-553cd70b794f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.15,
        "x": 0.05,
        "y": 0.95
      },
      "kind": "source-note",
      "text": "Source: PCM website",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c6e17397-b509-48be-b6df-f907bc2b30b3",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.85,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "title",
      "text": "Implementation of Capital Investment Plan should prioritize projects which are very relevant to the economic vision",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "995c4e63-1365-4f42-8630-3a08dd0d836f",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "CIP budget",
      "numberRaw": "22,939",
      "numberKind": "plain",
      "actionTitle": "Implementation of Capital Investment Plan should prioritize projects which are very relevant to the economic vision",
      "calloutText": "Thus, to ensure achievement of economic objectives, Lebanon should prioritize vision-relevant projects across several dimensions (including distribution of funds, allocation of resources, etc.)",
      "numberScale": null,
      "numberValue": 22.939,
      "metricFamily": "market_size",
      "numberCurrency": null
    }
  ],
  "tools": [
    {
      "name": "Chart Selection Guide",
      "slug": "chart-selection-guide",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "4c82b3fc-b8e3-49db-8cd6-8c451ef93e26",
      "evidence": "chart/bar-stacked-100pct: CIP budget by direct relevance to economic vision, USD mn",
      "confidence": 0.7
    },
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "a0ac2beb-8552-48ad-ba96-e5cb53bfeca9",
      "evidence": "list/bullet: The Capital Investment Plan’s ~270 projects will provided much-needed infrastructure spending to Lebanon, and every effort must be made to ensure successful implementation.",
      "confidence": 0.8
    }
  ],
  "frameworks": [
    {
      "name": "prioritization-matrix",
      "slug": null,
      "matchId": "2fd42b1b-81ab-425f-8a67-e0317bbbed7c",
      "evidence": "Categorization of projects by relevance to economic vision",
      "confidence": 0.8
    }
  ],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}