{
  "docId": "019dd923-5ca1-7489-b639-093f3fd1ecfe",
  "docSlug": "5ee5a9db2750184a",
  "documentTitle": "Lebanon Economic Vision",
  "authorId": "McKinsey",
  "authorName": "McKinsey",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.333,
  "pageNumber": 1035,
  "pageCount": 1274,
  "prevPage": 1034,
  "nextPage": 1036,
  "slideType": "recommendation",
  "function": "prioritize",
  "density": "overcrowded",
  "nDataPoints": 15,
  "notes": "Includes a watermark '20181218 Internal'. The chart is a 100% stacked bar chart showing budget distribution by relevance category.",
  "elementsJson": [
    "bullet_list",
    "bar_chart_100pct",
    "other"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b639-093f3fd1ecfe/1035",
  "deckHref": "/decks/019dd923-5ca1-7489-b639-093f3fd1ecfe",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b639-093f3fd1ecfe.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b639-093f3fd1ecfe#slide-1035",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "11 projects (representing 15% of total CIP budget) are deemed to be vision-critical.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-d3b9-7789-9905-07db75b35e64",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.13,
        "w": 0.67,
        "x": 0.24,
        "y": 0.43
      },
      "kind": "chart",
      "text": "CIP budget by direct relevance to economic vision, USD mn",
      "attrs": null,
      "subkind": "bar-stacked-100pct",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6d159722-567b-4dd3-a852-af07e61b5ab2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.92,
        "x": 0.04,
        "y": 0.89
      },
      "kind": "disclaimer",
      "text": "Top-down analysis suggests that Lebanon's annual infrastructure spending requirements exceed 4 billion USD, which far outweighs proposed spending under CIP. Thus, CIP is likely to be an “underestimate” of required infrastructure efforts.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "914d4ee8-e5a8-4f51-87cf-ed6f27d9f4d1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.74,
        "x": 0.22,
        "y": 0.95
      },
      "kind": "disclaimer",
      "text": "Note: Beyond vision relevance, several other criteria should be taken into consideration when prioritizing CIP projects (e.g. Social impact, feasibility, interdependencies, etc..)",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e3f7c521-9d74-4dd9-aa7b-c16fbbd29322",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.9,
        "x": 0.06,
        "y": 0.71
      },
      "kind": "list",
      "text": "Top-priority CIP projects include: Core power projects, Expansion of Beirut airport, Tripoli port, Deployment of Fiber network, Industrial zones (incl. Tripoli SEZ). Additional (new) priority projects include: Industrial construction zone (among other additional industrial zones), Beirut knowledge hub park, Urban improvement and tourism zone development in Beirut, Sour, Byblos",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "30ebf09e-3db8-4399-936f-252e7c6e39f9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.9,
        "x": 0.06,
        "y": 0.15
      },
      "kind": "list",
      "text": "The Capital Investment Plan's ~270 projects will provided much-needed infrastructure spending to Lebanon, and every effort must be made to ensure successful implementation. Several projects are highly relevant to the economic growth generally, and to the economic vision more specifically. 11 projects (representing 15% of total CIP budget) are deemed to be vision-critical. Thus, to ensure achievement of economic objectives, Lebanon should prioritize vision-relevant projects across several dimensions (including distribution of funds, allocation of resources, etc.). Moreover, a number of additional vision-linked priority projects need to be added to the government’s agenda",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bf97792e-55e4-4aff-b0eb-9f52e78fca85",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "CIP budget: 22,939",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-d3b9-7789-9905-09d2aade43f7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.12,
        "x": 0.04,
        "y": 0.96
      },
      "kind": "source-note",
      "text": "Source: PCM website",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "18d448a7-cf4e-40dd-9188-db572c3d8f86",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.92,
        "x": 0.04,
        "y": 0.03
      },
      "kind": "title",
      "text": "Implementation of Capital Investment Plan should prioritize projects which are very relevant to the economic vision",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "abe657e9-bb15-47a8-aa71-81330b56ffd6",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "CIP budget",
      "numberRaw": "22,939",
      "numberKind": "plain",
      "actionTitle": "Implementation of Capital Investment Plan should prioritize projects which are very relevant to the economic vision",
      "calloutText": "11 projects (representing 15% of total CIP budget) are deemed to be vision-critical.",
      "numberScale": null,
      "numberValue": 22.939,
      "metricFamily": "market_size",
      "numberCurrency": null
    }
  ],
  "tools": [
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "2dacfeff-c03c-42be-b949-7b51043645dc",
      "evidence": "list/bullet: The Capital Investment Plan's ~270 projects will provided much-needed infrastructure spending to Lebanon, and every effort must be made to ensure successful implementation. Several projects are highly releva",
      "confidence": 0.7
    }
  ],
  "frameworks": [
    {
      "name": "prioritization-matrix",
      "slug": null,
      "matchId": "6382e87f-dd83-4a02-8222-e3da011415fb",
      "evidence": "Categorization of projects by relevance to economic vision",
      "confidence": 0.8
    }
  ],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}