{
  "docId": "019dd923-5ca1-7489-b638-d296c13af3c5",
  "docSlug": "87a04ea9b7ff0d81",
  "documentTitle": "Affordable Housing Challenge Blueprint",
  "authorId": "McKinsey",
  "authorName": "McKinsey",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.333,
  "pageNumber": 42,
  "pageCount": 49,
  "prevPage": 41,
  "nextPage": 43,
  "slideType": "initiative_list",
  "function": "present_solution",
  "density": "dense",
  "nDataPoints": 2,
  "notes": "McKinsey Infrastructure Practice slide.",
  "elementsJson": [
    "headline_text",
    "bullet_list",
    "icon_grid"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b638-d296c13af3c5/42",
  "deckHref": "/decks/019dd923-5ca1-7489-b638-d296c13af3c5",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b638-d296c13af3c5.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b638-d296c13af3c5#slide-42",
  "components": [
    {
      "bbox": {
        "h": 0.15,
        "w": 0.8,
        "x": 0.13,
        "y": 0.345
      },
      "kind": "list",
      "text": "Design-to-value: De-specification of structural design, avoid non-value-added components; Identify substitutes and use design-to-cost to set specifications",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "13fa8fd6-ccd3-4470-8c28-0d87950391d5",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.8,
        "x": 0.13,
        "y": 0.475
      },
      "kind": "list",
      "text": "Purchasing excellence: Determine sourcing strategy; Commercial optimization (bundling, low-cost country sourcing); Technical optimization (standardize)",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5b48a101-753d-4fde-a958-5a8d7129c909",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.8,
        "x": 0.13,
        "y": 0.68
      },
      "kind": "list",
      "text": "Lean execution: Pre-manufacturing; Planning optimization (critical-path); On-site lean execution; Process step productivity (eliminate low value-added)",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "eb7c8692-5391-4b67-98b9-58308bdc74aa",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Cost reduction: 20-30%",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-d3bb-700a-9db0-2dae05210a42",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.25,
        "x": 0.05,
        "y": 0.95
      },
      "kind": "source-note",
      "text": "SOURCE: McKinsey Infrastructure Practice",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "2566ab8b-51db-4919-87c9-c0630e571b39",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.4,
        "x": 0.05,
        "y": 0.28
      },
      "kind": "subtitle",
      "text": "Overview of capital productivity: main cost reduction levers",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e3435eea-ea1d-4c17-9a3d-9057c71b9bbc",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.6,
        "x": 0.05,
        "y": 0.18
      },
      "kind": "title",
      "text": "Capital productivity strategies can cut costs by 20 to 30 percent",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e211c675-e257-4c62-82a0-1719ffe116c8",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "Cost reduction",
      "numberRaw": "20-30%",
      "numberKind": "percent",
      "actionTitle": "Capital productivity strategies can cut costs by 20 to 30 percent",
      "calloutText": null,
      "numberScale": null,
      "numberValue": -30,
      "metricFamily": "cost_savings",
      "numberCurrency": null
    }
  ],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 49,
      "from": 10,
      "beatId": "8265bf01-78ee-477d-88a0-a9dae3cb65ea",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Impact & Next Steps",
      "beatSlug": "consultants-gambit-impact-next-steps",
      "evidence": "The document presents impact sizing and case studies to support the proposed solutions.",
      "position": 3,
      "confidence": 0.8,
      "parentBeatName": "Resolution",
      "parentBeatSlug": "resolution"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}