{
  "docId": "019dd923-5ca1-7489-b638-7c979c845443",
  "docSlug": "c002e0cf0d8e656a",
  "documentTitle": "Fab Automation AI",
  "authorId": "McKinsey",
  "authorName": "McKinsey",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 8,
  "pageCount": 17,
  "prevPage": 7,
  "nextPage": 9,
  "slideType": "industry_trends",
  "function": "present_framework",
  "density": "dense",
  "nDataPoints": 0,
  "notes": "McKinsey & Company slide 8. Illustrates a digital thread connecting planning, design, manufacturing, and remote control.",
  "elementsJson": [
    "headline_text",
    "bullet_list",
    "infographic"
  ],
  "metadataConfidence": 0.95,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b638-7c979c845443/8",
  "deckHref": "/decks/019dd923-5ca1-7489-b638-7c979c845443",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b638-7c979c845443.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b638-7c979c845443#slide-8",
  "components": [
    {
      "bbox": {
        "h": 0.6,
        "w": 0.7,
        "x": 0.15,
        "y": 0.25
      },
      "kind": "image",
      "text": "Central illustration of a smart factory floor with servers, robotic arms, and control centers.",
      "attrs": null,
      "subkind": "infographic",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "7d8dcf85-9564-404b-89ca-25a23bde7c61",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.28,
        "x": 0.7,
        "y": 0.72
      },
      "kind": "list",
      "text": "Remote control center: Line control/scheduling, Real time capacity simulation, Predictive maintenance",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "04e2cb4b-77c6-4bbb-99d5-bc4eb00b3b6a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.22,
        "x": 0.02,
        "y": 0.13
      },
      "kind": "list",
      "text": "Fab planning and construction: Advanced fab planning, Project management",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3cbbbeae-ba5d-48ec-b03b-606042f6a971",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.4,
        "x": 0.55,
        "y": 0.07
      },
      "kind": "list",
      "text": "Manufacturing with real time analytics and control: Smart FDC, Next gen APC/R2R control, Automated AMHS/MCS, Real time dispatching",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6ee33fa6-b748-437c-b28f-05cd4dae178c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.22,
        "x": 0.02,
        "y": 0.68
      },
      "kind": "list",
      "text": "Design and process development center: Design for manufacturability",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ec05b376-7e31-40b4-b617-e6eaba486194",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.22,
        "x": 0.25,
        "y": 0.1
      },
      "kind": "paragraph",
      "text": "Digital thread: powered by powerful data lake and cloud computing to ensure real time connectivity and analytics between all functions",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e3bbb933-0339-436c-82bc-16cefa3deae4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.18,
        "x": 0.38,
        "y": 0.85
      },
      "kind": "paragraph",
      "text": "Customer co-creation: involve customer early in development and ensure design-to-value",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e92829a2-c943-4a27-a716-ce1beba769e3",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.55,
        "x": 0.02,
        "y": 0.03
      },
      "kind": "title",
      "text": "Advanced fabs already with 'high intensity' data environments",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1b82a60c-ed42-4279-82b9-28c9181a1b71",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [
    {
      "name": "Digital Thread",
      "slug": null,
      "matchId": "0685a413-46db-4a31-9be1-f09b0e302e65",
      "evidence": "Explicitly labeled as 'Digital thread' connecting various fab functions.",
      "confidence": 0.9
    }
  ],
  "arcBeats": [
    {
      "to": 13,
      "from": 6,
      "beatId": "17c97aaf-f4c9-44f5-95c5-c47003083979",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Problem & Complication",
      "beatSlug": "consultants-gambit-problem-complication",
      "evidence": "Slides 6-13 discuss the challenges and pain points in the semiconductor sector.",
      "position": 1,
      "confidence": 0.8,
      "parentBeatName": "Complication",
      "parentBeatSlug": "complication"
    }
  ],
  "loops": [
    {
      "to": 13,
      "from": 6,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "88172901-d18f-4177-8700-eb2f1626cb4a",
      "evidence": "Slides 6-13 discuss the challenges and pain points in the semiconductor sector, implying the cost of inaction.",
      "position": 0,
      "objective": "What are the consequences of not adopting AI in the semiconductor sector?",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.7,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}