  "documentTitle": "Constraints to growth: supply chain risks facing renewables Presentation",
  "authorId": "LEK",
  "authorName": "L.E.K.",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 8,
  "pageCount": 11,
  "prevPage": 7,
  "nextPage": 9,
  "slideType": "industry_trends",
  "function": "diagnose",
  "density": "overcrowded",
  "nDataPoints": 3,
  "notes": "Includes qualitative insights from industry participants (Senior VP, EPC and Project Manager).",
  "elementsJson": [
    "bar_chart_vertical",
    "bullet_list",
    "quote_block",
    "callout_box"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b638-0356a0f80391/8",
  "deckHref": "/decks/019dd923-5ca1-7489-b638-0356a0f80391",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b638-0356a0f80391.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b638-0356a0f80391#slide-8",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "Buyers have cited that current lead time quotes over 100 weeks are not unheard of today",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-c7cb-728d-8e79-dc934d7de82e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.65,
        "w": 0.32,
        "x": 0.04,
        "y": 0.21
      },
      "kind": "chart",
      "text": "U.S. average transformer lead time (2020, 22)",
      "attrs": null,
      "subkind": "bar-vertical",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1d6e6cd0-d29e-4cd4-b24e-4629b2132dd5",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.6,
        "w": 0.6,
        "x": 0.38,
        "y": 0.205
      },
      "kind": "list",
      "text": "Lead times are not expected to be a significant bottleneck for new capacity until lead time exceeds construction time (~18-24 months)\nAging power grid, ongoing supply chain issues, and growing demand for renewable installations are key drivers of the issue\nLead times rose from ~3 months in 2020 to ~12 months in 2022; some utilities reported lead times of ~3 years\nSome market participants believe that lead times will decrease",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8e382f4b-1028-40ed-9bf4-0b312d32e712",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Months: 12",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-c7cb-728d-8e79-e442fd047c45",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.58,
        "x": 0.38,
        "y": 0.83
      },
      "kind": "quote",
      "text": "… There was a demand shock in 2022, but I think after next year transformer manufacturers will be better prepared to provide the market with transformers. They’re working three shifts a day, and I expect lead times to come down … Project Manager, Engineering Company",
      "attrs": null,
      "subkind": "testimonial",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3d4424f5-d968-4af9-ad00-0c25c117cae4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.58,
        "x": 0.38,
        "y": 0.355
      },
      "kind": "quote",
      "text": "… Solar projects require a lot more transformers compared to a traditional coal plant, you need many dotted around the site which leads to higher demand and longer lead times… Senior VP, EPC",
      "attrs": null,
      "subkind": "testimonial",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3fb43dde-f947-463f-bb70-127671d9c18e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "quote",
      "text": "Solar projects require a lot more transformers compared to a traditional coal plant, you need many dotted around the site which leads to higher demand and longer lead times... (Senior VP, EPC)",
      "attrs": null,
      "subkind": null,
      "toolName": "Authority citation",
      "toolSlug": "authority-citation",
      "confidence": null,
      "componentId": "019dd951-c7cb-728d-8e79-e1db8b6a863b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.25,
        "x": 0.04,
        "y": 0.905
      },
      "kind": "source-note",
      "text": "Source: APPA; T&D World; L.E.K. research and analysis",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "77cafc15-6330-44b0-a407-d76863c8db67",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.85,
        "x": 0.038,
        "y": 0.105
      },
      "kind": "title",
      "text": "Transformer lead times are a critical issue today and beginning to impact marginal projects",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a5cc46ec-5932-41b5-8d0a-c76d907982cf",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "Months",
      "numberRaw": "12",
      "numberKind": "plain",
      "actionTitle": "Transformer lead times are a critical issue today and beginning to impact marginal projects",
      "calloutText": "Buyers have cited that current lead time quotes over 100 weeks are not unheard of today",
      "numberScale": null,
      "numberValue": 12,
      "metricFamily": "other",
      "numberCurrency": null
    }
  ],
  "tools": [
    {
      "name": "Action Titles",
      "slug": "action-titles",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "019de7de-fad2-70c8-a376-48c42ae7d2e2",
      "evidence": "Title states transformer lead times are critical today",
      "confidence": 90
    },
    {
      "name": "Annotation",
      "slug": "annotation",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019de7de-fb82-709c-8042-b4b8a8b4d08b",
      "evidence": "Callout cites 100+ week lead times",
      "confidence": 70
    },
    {
      "name": "Call to action",
      "slug": "call-to-action",
      "agent": null,
      "layer": "slide",
      "matchId": "00690d11-4dc7-4d81-8032-188330d136f2",
      "evidence": "The slide highlights the importance of monitoring transformer lead times.",
      "confidence": 0.6
    },
    {
      "name": "Chart Selection Guide",
      "slug": "chart-selection-guide",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019de7de-faf6-70df-af5e-d29d8c28576b",
      "evidence": "Bar chart shows dramatic lead-time increase",
      "confidence": 85
    },
    {
      "name": "Credibility Transfer",
      "slug": "credibility-transfer",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "019de7de-fb1a-735c-a9b5-64db6c25fd72",
      "evidence": "Senior VP EPC quote on transformer demand",
      "confidence": 85
    },
    {
      "name": "Von Restorff Effect",
      "slug": "von-restorff-effect",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019de7de-fba7-7222-8992-4865b1e1088a",
      "evidence": "Spike in 2022 bar visually distinct from baseline",
      "confidence": 60
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 9,
      "from": 5,
      "beatId": "019de7de-f0df-7158-bdf5-0f2d70a40509",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Evidence & Proof",
      "beatSlug": null,
      "evidence": "Per-constraint deep dives plus heatmap synthesis",
      "position": 4,
      "confidence": 78,
      "parentBeatName": null,
      "parentBeatSlug": null
    },
    {
      "to": 9,
      "from": 5,
      "beatId": "019de7de-f207-766f-b025-e1e661c60e58",
      "arcName": "The Triple Take",
      "arcSlug": "triple-take",
      "beatName": "The Implications (So What)",
      "beatSlug": null,
      "evidence": "Three constraint diagnoses and risk heatmap",
      "position": 2,
      "confidence": 65,
      "parentBeatName": null,
      "parentBeatSlug": null
    }
  ],
  "loops": [
    {
      "to": 9,
      "from": 4,
      "name": "Issue Tree",
      "slug": "43-issue-tree",
      "bestFor": "Problem structuring, project scoping, complex analysis",
      "matchId": "019de7de-f276-70ea-ae54-a93b1899faea",
      "evidence": "Solar framing (p4), interconnection (p5-6), labor (p7), equipment (p8), heatmap synthesis (p9)",
      "position": 2,
      "objective": "Decompose the constraint question into three sub-questions and synthesize answer",
      "structure": "The Key Question -> Sub-Question A -> Sub-Question B -> Sub-Question C -> Synthesized Answer",
      "confidence": 80,
      "description": "Break a key question into sub-questions until you reach answerable, actionable pieces"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}