{
  "docId": "019dd923-5ca1-7489-b638-0356a0f80391",
  "docSlug": "bf11fb5514698fcd",
  "documentTitle": "Constraints to growth: supply chain risks facing renewables Presentation",
  "authorId": "LEK",
  "authorName": "L.E.K.",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 10,
  "pageCount": 11,
  "prevPage": 9,
  "nextPage": 11,
  "slideType": "risk_register",
  "function": "diagnose",
  "density": "overcrowded",
  "nDataPoints": 4,
  "notes": null,
  "elementsJson": [
    "headline_text",
    "bullet_list",
    "icon_grid"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b638-0356a0f80391/10",
  "deckHref": "/decks/019dd923-5ca1-7489-b638-0356a0f80391",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b638-0356a0f80391.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b638-0356a0f80391#slide-10",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "Many regional and interregional transmission links have significant potential economic value and expanding transmissions could save >$300B in power system costs for consumers and allow additional renewable projects to be onboarded",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-c7cb-728d-8e7c-927118aa4be1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.13,
        "w": 0.92,
        "x": 0.04,
        "y": 0.543
      },
      "kind": "list",
      "text": "Considerable investment is required; To achieve 100% clean electricity by 2035, a total of 91,000 miles of new transmission lines required within the next 13 years",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "021ccb47-ac2a-4092-8b1f-9680c598a76e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.13,
        "w": 0.92,
        "x": 0.04,
        "y": 0.375
      },
      "kind": "list",
      "text": "Transmission connection times are rapidly increasing; ~950GW of solar capacity is currently seeking transmission access with typical duration from connection request to commercial operation at 5 years in 2022 (up from <2 years between 2000-2007)",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "07f1fe08-2869-43ec-8007-9f88fd7b1cba",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.13,
        "w": 0.92,
        "x": 0.04,
        "y": 0.711
      },
      "kind": "list",
      "text": "Value can be unlocked for developers, EPCs and consumers; Many regional and interregional transmission links have significant potential economic value and expanding transmissions could save >$300B in power system costs for consumers and allow additional renewable projects to be onboarded",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6c1d5bb5-2c59-43c0-91b1-5c977e88c7e9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.13,
        "w": 0.92,
        "x": 0.04,
        "y": 0.207
      },
      "kind": "list",
      "text": "Transmission congestion is the next key bottleneck; Transmission miles being built has declined over time and insufficient transmission lines have become a major “bottleneck” in deploying renewable resources",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d980312a-54a6-4f2f-97dc-68e25c7a040d",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "power system costs: $300B",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-c7cb-728d-8e7c-96c9402686d4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.2,
        "x": 0.04,
        "y": 0.905
      },
      "kind": "source-note",
      "text": "Source: L.E.K. research and analysis; LBNL",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "cec15e1d-59be-4975-a0d1-31416c25afa8",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.94,
        "x": 0.03,
        "y": 0.06
      },
      "kind": "title",
      "text": "While the risk outlook appears manageable, one final risk to consider: the lack of interregional transmission lines",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e8dee155-648e-4f19-9aad-e46dac9d4a3d",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "power system costs",
      "numberRaw": "$300B",
      "numberKind": "money",
      "actionTitle": "While the risk outlook appears manageable, one final risk to consider: the lack of interregional transmission lines",
      "calloutText": "Many regional and interregional transmission links have significant potential economic value and expanding transmissions could save >$300B in power system costs for consumers and allow additional renewable projects to be onboarded",
      "numberScale": "b",
      "numberValue": 300,
      "metricFamily": "cost_savings",
      "numberCurrency": "$"
    }
  ],
  "tools": [
    {
      "name": "Action Titles",
      "slug": "action-titles",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "019de7de-fd21-771a-a201-b3febe11c08d",
      "evidence": "Title flags one final risk despite manageable outlook",
      "confidence": 88
    },
    {
      "name": "Call to action",
      "slug": "call-to-action",
      "agent": null,
      "layer": "slide",
      "matchId": "56df17f8-6115-4202-bbc4-227ceb10ab0c",
      "evidence": "The slide highlights the importance of addressing transmission line risks.",
      "confidence": 0.6
    },
    {
      "name": "Concrete Language",
      "slug": "concrete-language",
      "agent": "Storyteller",
      "layer": "slide",
      "matchId": "019de7de-fdb3-7637-9e16-5a63c8d24d99",
      "evidence": "300B power system cost figure anchors stakes",
      "confidence": 70
    },
    {
      "name": "Core Message Extraction",
      "slug": "core-message-extraction",
      "agent": "Architect",
      "layer": "slide",
      "matchId": "019de7de-fd8d-77ab-8ffc-4a24acc1a69f",
      "evidence": "Distills final residual risk in one line",
      "confidence": 65
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 11,
      "from": 10,
      "beatId": "019de7de-f143-7552-880a-a48c346bbe00",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Impact & Next Steps",
      "beatSlug": null,
      "evidence": "Transmission risk callout and contact close",
      "position": 5,
      "confidence": 78,
      "parentBeatName": null,
      "parentBeatSlug": null
    },
    {
      "to": 11,
      "from": 10,
      "beatId": "019de7de-f22d-746d-841e-e381478f1846",
      "arcName": "The Triple Take",
      "arcSlug": "triple-take",
      "beatName": "The Action (Now What)",
      "beatSlug": null,
      "evidence": "Final transmission caveat and close",
      "position": 3,
      "confidence": 65,
      "parentBeatName": null,
      "parentBeatSlug": null
    }
  ],
  "loops": [
    {
      "to": 10,
      "from": 10,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "019de7de-f29b-704f-8fa9-92e702257497",
      "evidence": "Action title frames lack of interregional transmission as a residual risk",
      "position": 3,
      "objective": "Flag transmission as a final unmanaged risk",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 50,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}