{
  "docId": "019dd923-5ca1-7489-b637-75d8e267c76f",
  "docSlug": "e01ca0dd732f0beb",
  "documentTitle": "Future-back Breakthrough Growth",
  "authorId": "Innosight",
  "authorName": "Innosight",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "portrait",
  "aspectRatio": 0.773,
  "pageNumber": 6,
  "pageCount": 10,
  "prevPage": 5,
  "nextPage": 7,
  "slideType": "diagnosis",
  "function": "present_framework",
  "density": "overcrowded",
  "nDataPoints": 0,
  "notes": "The slide illustrates the 'Future-Back' methodology, specifically focusing on the transition from long-term vision to short-term resource allocation.",
  "elementsJson": [
    "paragraph",
    "process_diagram",
    "pie_chart"
  ],
  "metadataConfidence": 0.95,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b637-75d8e267c76f/6",
  "deckHref": "/decks/019dd923-5ca1-7489-b637-75d8e267c76f",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b637-75d8e267c76f.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b637-75d8e267c76f#slide-6",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "The envisioned Strategic Opportunity Areas (SOAs) and adjacencies in the Future State portfolio are walked back to the present in the form of the planned initiatives in the Innovation and Growth Portfolio.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-c23f-7114-a8a8-cde5945d03fd",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.35,
        "x": 0.103,
        "y": 0.56
      },
      "kind": "diagram",
      "text": "Visual representation of the Future-Back portfolio mapping process",
      "attrs": null,
      "subkind": "process",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "045dfd01-d4c5-48d7-9930-20c1329e69af",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "framework",
      "text": "Future-Back",
      "attrs": null,
      "subkind": null,
      "toolName": "Structuring frame",
      "toolSlug": "structuring-frame",
      "confidence": null,
      "componentId": "019dd951-c23f-7114-a8a8-d15289f5d090",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.35,
        "x": 0.103,
        "y": 0.43
      },
      "kind": "paragraph",
      "text": "The envisioned Strategic Opportunity Areas (SOAs) and adjacencies in the Future State portfolio are walked back to the present in the form of the planned initiatives in the Innovation and Growth Portfolio. The Investment Portfolio allocates dollars between core, adjacent, and new growth initiatives.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4383e1b2-7ed1-4bff-93cf-8b95adde1a8b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.33,
        "x": 0.57,
        "y": 0.4
      },
      "kind": "paragraph",
      "text": "Having a well-developed vision is crucial, but it is never enough; you also need a concrete plan to turn it into a reality. This calls for a shift in mindset, from storyteller to engineer. Imagine that you are filling and balancing three linked and interdependent portfolios.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "97aa4997-0b16-41ec-8cb5-f39d55c85d0b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.33,
        "x": 0.57,
        "y": 0.56
      },
      "kind": "paragraph",
      "text": "Your future state portfolio is typically a financial projection of your enterprise at your target end date, in which your high-level assertions about your future businesses are translated into dollars and cents. Your innovation portfolio is a set of planned projects or initiatives, prioritized for the next one to three years, that reflect the future state portfolio. Your investment portfolio specifies the resources (in both dollars and people) that you will need to fund the innovation portfolio.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c718d1eb-4972-479d-90e2-f2a7585bc311",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.5,
        "x": 0.103,
        "y": 0.4
      },
      "kind": "title",
      "text": "Linking Future Opportunities with Today's Initiatives",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d6613c35-2378-4d6d-b3e8-1c06b7a417ef",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.65,
        "x": 0.103,
        "y": 0.365
      },
      "kind": "title",
      "text": "STEP II: CONVERT YOUR VISION INTO A STRATEGY",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "913b6622-caa6-4473-9a6d-7de7af887d3e",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Waterfall chart",
      "slug": "waterfall-chart",
      "agent": null,
      "layer": "slide",
      "matchId": "80b4c285-c77a-422d-ba3e-466ac0768e53",
      "evidence": "The slide mentions 'Financial projection' and 'Future State portfolio', which is similar to a waterfall chart.",
      "confidence": 0.8
    }
  ],
  "frameworks": [
    {
      "name": "Future-Back Strategy",
      "slug": null,
      "matchId": "e77fc574-127d-418d-bcf9-3955062966ad",
      "evidence": "Explicitly mentioned in the header and body text as the core methodology.",
      "confidence": 1
    }
  ],
  "arcBeats": [
    {
      "to": 6,
      "from": 5,
      "beatId": "d9f75704-b940-4cf1-866e-0c992b381bfb",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Solution & Approach",
      "beatSlug": "consultants-gambit-solution-approach",
      "evidence": "The key messages and diagnosis slides present the solution and approach",
      "position": 2,
      "confidence": 0.8,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}