  "nextPage": 38,
  "slideType": "data_table",
  "function": "quantify_impact",
  "density": "dense",
  "nDataPoints": 20,
  "notes": "Includes sample calculations for steam turbine generator and reactor vessel production times.",
  "elementsJson": [
    "headline_text",
    "paragraph",
    "data_table",
    "callout_box"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b636-cc8c394653ea/37",
  "deckHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea#slide-37",
  "components": [
    {
      "bbox": {
        "h": 0.4,
        "w": 0.25,
        "x": 0.72,
        "y": 0.5
      },
      "kind": "callout",
      "text": "Assumptions and Case Selection criteria",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9ad2bc09-3208-45cf-97e5-3591d6a7b46d",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "callout",
      "text": "If production time for 99 reactors is 25 years, four suppliers will be required.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-ba8d-77da-996e-7dc102e9816f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.65,
        "x": 0.05,
        "y": 0.55
      },
      "kind": "list",
      "text": "Sample calculations for Steam Turbine Generator and Reactor Vessel",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "61c23426-eaf2-411c-b0f0-201cf5089fe1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Total time FOAK (months): 36",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-ba8d-77da-996e-80ee7c73fb08",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.9,
        "x": 0.05,
        "y": 0.1
      },
      "kind": "paragraph",
      "text": "We have identified the component manufacturing production time for those with the shortest and longest lead-time and calculated the number of suppliers required to meet the demand for 99 reactors by 2050.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9f8e12f2-77c9-4140-8117-008090625e29",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.5,
        "x": 0.05,
        "y": 0.92
      },
      "kind": "source-note",
      "text": "Source: ARC Clean Technology Canada Inc., Procurement Plan for long-lead Equipment; Client Discussions, Deloitte research",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0d23e0cd-ce22-4ed0-a702-3fd4725315f9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.9,
        "x": 0.05,
        "y": 0.25
      },
      "kind": "table",
      "text": "FOAK production time table",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "280d3444-a4a2-4eaf-a426-cef58810277a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.6,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "title",
      "text": "How are long-lead items linked to demand?",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "11bf3ffe-e76b-4b00-82ae-f2d52dd3a48b",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "Total time FOAK (months)",
      "numberRaw": "36",
      "numberKind": "plain",
      "actionTitle": "How are long-lead items linked to demand?",
      "calloutText": "If production time for 99 reactors is 25 years, four suppliers will be required.",
      "numberScale": null,
      "numberValue": 36,
      "metricFamily": "other",
      "numberCurrency": null
    }
  ],
  "tools": [],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}