{
  "docId": "019dd923-5ca1-7489-b636-cc8c394653ea",
  "docSlug": "2e16b33cb38335ea",
  "documentTitle": "New Brunswick Supply Chain Study",
  "authorId": "Deloitte",
  "authorName": "Deloitte",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 25,
  "pageCount": 70,
  "prevPage": 24,
  "nextPage": 26,
  "slideType": "market_sizing",
  "function": "size_opportunity",
  "density": "overcrowded",
  "nDataPoints": 150,
  "notes": "Includes three stacked bar charts representing low, base, and high adoption scenarios for ARC-100 SMRs.",
  "elementsJson": [
    "headline_text",
    "action_title",
    "paragraph",
    "bar_chart_stacked",
    "bullet_list",
    "footnote"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b636-cc8c394653ea/25",
  "deckHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea#slide-25",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "If the total project cost is assumed to be $1B CDN, it is estimated that the total annual value for manufacturing only long-lead components in New Brunswick could reach ~$2.3B in the low adoption scenario, $4.2B in the base scenario, and $6.2B in the high scenario.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-ba8d-77da-996b-8ecab990585e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.3,
        "x": 0.36,
        "y": 0.22
      },
      "kind": "chart",
      "text": "Base ARC-100 adoption scenario",
      "attrs": null,
      "subkind": "bar-stacked",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "311be14e-9d7a-4238-ab67-6a3aa8bd99d5",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.3,
        "x": 0.67,
        "y": 0.22
      },
      "kind": "chart",
      "text": "High ARC-100 adoption scenario",
      "attrs": null,
      "subkind": "bar-stacked",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "7d58429d-ca37-4e0c-9941-ae6b4e540b41",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.3,
        "x": 0.05,
        "y": 0.22
      },
      "kind": "chart",
      "text": "Low ARC-100 adoption scenario",
      "attrs": null,
      "subkind": "bar-stacked",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "cbaa49b7-a12e-4abc-ad1d-42c8cad8d28e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.9,
        "x": 0.05,
        "y": 0.9
      },
      "kind": "disclaimer",
      "text": "* 1- The total project cost assumed here ($1B) is used as an illustrative example... 4- GDP Source: Statista.com",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "7b5c742e-749b-4dcc-8f1e-592c50b188bf",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.9,
        "x": 0.05,
        "y": 0.65
      },
      "kind": "list",
      "text": "FOAK 2030: If the projected deployment is achieved... Mid-Term NOAK (2040): Across the three scenarios... Long-Term NOAK (2050): Total annual value could potentially increase...",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "04933c31-5585-4684-8fba-fb3d7e41ce3c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Annual manufacturing value: $6.2B",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-ba8d-77da-996b-92be2fc607d4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.9,
        "x": 0.05,
        "y": 0.12
      },
      "kind": "paragraph",
      "text": "The deployment of SMRs will unlock value for nuclear component manufacturers and non-nuclear and pressure vessel manufacturers. If the total project cost is assumed to be $1B CDN, it is estimated that the total annual value for manufacturing only long-lead components in New Brunswick could reach ~$2.3B in the low adoption scenario, $4.2B in the base scenario, and $6.2B in the high scenario representing ~7%, 13%, and 19% of provincial GDP (2022) respectively by 2050*.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "73506c6b-d707-426a-aa41-9818c9bfd6ac",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.5,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "title",
      "text": "Size of the SMR fabrication opportunity",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1da73d04-0fd1-4c3c-8f46-ac0f8a209d28",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "Annual manufacturing value",
      "numberRaw": "$6.2B",
      "numberKind": "money",
      "actionTitle": "Size of the SMR fabrication opportunity",
      "calloutText": "If the total project cost is assumed to be $1B CDN, it is estimated that the total annual value for manufacturing only long-lead components in New Brunswick could reach ~$2.3B in the low adoption scenario, $4.2B in the base scenario, and $6.2B in the high scenario.",
      "numberScale": "b",
      "numberValue": 6.2,
      "metricFamily": "other",
      "numberCurrency": "$"
    }
  ],
  "tools": [],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}