  "documentTitle": "New Brunswick Supply Chain Study",
  "authorId": "Deloitte",
  "authorName": "Deloitte",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 22,
  "pageCount": 70,
  "prevPage": 21,
  "nextPage": 23,
  "slideType": "data_table",
  "function": "analyze_data",
  "density": "overcrowded",
  "nDataPoints": 25,
  "notes": "The chart uses a horizontal stacked bar format where the Y-axis represents time (years) and the X-axis represents the number of units.",
  "elementsJson": [
    "headline_text",
    "paragraph",
    "bar_chart_stacked",
    "callout_box",
    "bullet_list"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b636-cc8c394653ea/22",
  "deckHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea#slide-22",
  "components": [
    {
      "bbox": null,
      "kind": "callout",
      "text": "To meet projected demand under the base scenario, fabricating shop capacities should be in place as early as 2027. And fabricators also need to be well-prepared for producing larger quantities of major components by 2033.",
      "attrs": null,
      "subkind": null,
      "toolName": "Visual emphasis",
      "toolSlug": "visual-emphasis",
      "confidence": null,
      "componentId": "019dd951-ba8d-77da-996b-dbb1a5b9c73a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.7,
        "w": 0.63,
        "x": 0.03,
        "y": 0.2
      },
      "kind": "chart",
      "text": "Long-Lead Components Demand Chart",
      "attrs": null,
      "subkind": "bar-stacked-horizontal",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bf8b065f-c777-4e65-a3c7-58bfc986e511",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.45,
        "w": 0.12,
        "x": 0.55,
        "y": 0.38
      },
      "kind": "legend",
      "text": "Control Rod Assemblies, Control Rod Drive, Electromagnetic Pumps, Condenser, Feed Water Heater, In-Vessel Transfer Machine, Guard Vessel, Instrumentation & Controls, Intermediate Heat Exchangers, Reactor Internals, Reactor Vessel, Steam Generators, Steam Turbine Generator",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3bbb8699-60c8-4ce1-991f-e82672d732b0",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.28,
        "x": 0.68,
        "y": 0.2
      },
      "kind": "list",
      "text": "These estimates reflect the volume AND the lead times of the demand that must be met by fabricators/suppliers to achieve the base scenario projected target of deploying 100 ARC-100 units by 2050. Three main component groups that must be fabricated will dominate the demand volume: Control rod assemblies, Control rod drive, Electromagnetic pumps",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "75c04b2b-728a-4f6b-953b-3f27e70ac66a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.28,
        "x": 0.68,
        "y": 0.55
      },
      "kind": "list",
      "text": "Definitions and assumptions: Ramp-up period: more than 100 total component units. Timing includes fabrication AND shipping time, without considering any discounting for standardization. All components could be fabricated in parallel. The base scenario's projection assumptions are used in conjunction with the long-lead component data from ARC's procurement plan. Lead time months are rounded up to one year. Lead times are the average of the ranges highlighted in ARC's procurement plan. Refer to Appendix section for additional detailed assumptions.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "bf803934-f9b1-4bad-8ca7-d6515a37a4ab",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": null,
      "kind": "metric",
      "text": "Procurement demand (units): 100",
      "attrs": null,
      "subkind": "primary",
      "toolName": "Quantification",
      "toolSlug": "quantification",
      "confidence": null,
      "componentId": "019dd951-ba8d-77da-996b-df51f2796c27",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.9,
        "x": 0.05,
        "y": 0.11
      },
      "kind": "paragraph",
      "text": "To meet the projected demand of 100 units by 2050 under the base scenario, equipment fabrication needs to start as early as 2027. Three major components: control rod assemblies, the control rod drive, and electromagnetic pumps require fabricators to pre-build shop capacity for mass production.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a57b4303-3529-4cc1-9edc-3bb10d6e310d",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.9,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "title",
      "text": "Base scenario: ARC-100 long-lead components procurement demand",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3ada571a-72f1-4c9b-80e3-1ed76b37eb6f",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [
    {
      "metricRaw": "Procurement demand (units)",
      "numberRaw": "100",
      "numberKind": "plain",
      "actionTitle": "Base scenario: ARC-100 long-lead components procurement demand",
      "calloutText": "To meet projected demand under the base scenario, fabricating shop capacities should be in place as early as 2027. And fabricators also need to be well-prepared for producing larger quantities of major components by 2033.",
      "numberScale": null,
      "numberValue": 100,
      "metricFamily": "other",
      "numberCurrency": null
    }
  ],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 24,
      "from": 20,
      "beatId": "0eba63f4-5525-4e3d-ac8d-373e26a13173",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Evidence & Proof",
      "beatSlug": "consultants-gambit-evidence-proof",
      "evidence": "Demand forecast and market sizing",
      "position": 2,
      "confidence": 0.8,
      "parentBeatName": "Evidence",
      "parentBeatSlug": "evidence"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}