  "documentTitle": "New Brunswick Supply Chain Study",
  "authorId": "Deloitte",
  "authorName": "Deloitte",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 12,
  "pageCount": 70,
  "prevPage": 11,
  "nextPage": 13,
  "slideType": "appendix_methodology",
  "function": "establish_context",
  "density": "balanced",
  "nDataPoints": 0,
  "notes": "The slide uses a two-box layout to separate demand-side assumptions from supply-side assumptions.",
  "elementsJson": [
    "headline_text",
    "bullet_list",
    "callout_box"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b636-cc8c394653ea/12",
  "deckHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b636-cc8c394653ea#slide-12",
  "components": [
    {
      "bbox": {
        "h": 0.3,
        "w": 0.6,
        "x": 0.05,
        "y": 0.15
      },
      "kind": "list",
      "text": "DEMAND: List of critical long-lead equipment items, their quantity, and design/fabrication/shipment lead times were retrieved from the Draft Procurement Plan for Long-Lead Equipment prepared by ARC in June 2023. For any UNKNOWN data in the Draft Procurement Plan for Long-Lead Equipment, assumptions were discussed with ARC and noted in the slides that follow.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a24892a6-1a66-4147-8625-7839b452d528",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.3,
        "w": 0.6,
        "x": 0.05,
        "y": 0.54
      },
      "kind": "list",
      "text": "SUPPLY: List of critical long-lead items was retrieved from the Draft Procurement Plan for Long-Lead Equipment prepared by ARC. Suppliers identified for the FOAK reactor are based on manufacturing location and their self-identified expertise in the nuclear industry. Provincial suppliers for the NOAK reactor are based on expressed interest from ONB’s Company Self-Assessment Survey conducted in 2022.",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "fe56ac3a-6ff0-4d18-b055-3629111b6c15",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.35,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "title",
      "text": "Project assumptions",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f528ca2d-f9ea-4a1f-a5e6-bdb432d5381e",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 13,
      "from": 9,
      "beatId": "6ea6e5ee-ebda-41f2-80aa-28c584c9eff1",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Situation & Context",
      "beatSlug": "consultants-gambit-situation-context",
      "evidence": "The study objective and purpose are outlined",
      "position": 0,
      "confidence": 0.8,
      "parentBeatName": "Setup",
      "parentBeatSlug": "setup"
    }
  ],