{
  "docId": "019dd923-5ca1-7489-b636-720e80254801",
  "docSlug": "f3e36b18b812595c",
  "documentTitle": "Doing business in the Philippines 2021",
  "authorId": "Deloitte",
  "authorName": "Deloitte",
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": "landscape",
  "aspectRatio": 1.778,
  "pageNumber": 51,
  "pageCount": 67,
  "prevPage": 50,
  "nextPage": 52,
  "slideType": "initiative_list",
  "function": "summarize",
  "density": "balanced",
  "nDataPoints": 0,
  "notes": "The slide uses a two-column icon-based list to categorize various infrastructure sectors.",
  "elementsJson": [
    "paragraph",
    "icon_grid"
  ],
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019dd923-5ca1-7489-b636-720e80254801/51",
  "deckHref": "/decks/019dd923-5ca1-7489-b636-720e80254801",
  "deckJsonHref": "/decks/019dd923-5ca1-7489-b636-720e80254801.json",
  "deckAnchorHref": "/decks/019dd923-5ca1-7489-b636-720e80254801#slide-51",
  "components": [
    {
      "bbox": {
        "h": 0.75,
        "w": 0.25,
        "x": 0.57,
        "y": 0.14
      },
      "kind": "list",
      "text": "Education/Health, Land reclamation, Industrial/Tourism estates, Government buildings, Markets, Warehouses, Fish ports, Environmental/Waste management, Climate change mitigation",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "af031b5e-57a5-4846-b194-5f610bb2f2a8",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.75,
        "w": 0.2,
        "x": 0.3,
        "y": 0.14
      },
      "kind": "list",
      "text": "Highways, Railways, Non-rail mass transit, Port infrastructure, Airports, Power generation, Telecommunications, IT/Database, Irrigation, Water supply",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "defc0903-9ae5-4de8-a9a1-268dbd3fa234",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.25,
        "x": 0.03,
        "y": 0.14
      },
      "kind": "paragraph",
      "text": "The Build-Operate-Transfer Law authorizes the private sector to finance, construct, operate, and maintain infrastructure projects for a defined period of time, and provides the legal and regulatory framework for the PPP Program. Any individual, partnership, corporation or firm, whether local or foreign, including consortia of local and foreign firms, may participate in the prequalification and bidding for the following PPP projects.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5a14920b-e776-413a-8553-54f6e7b2db34",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.3,
        "x": 0.02,
        "y": 0.04
      },
      "kind": "title",
      "text": "Eligible projects for PPP arrangement",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f5777ee9-de63-4a69-b352-725793dd026b",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Picture Superiority Effect",
      "slug": "picture-superiority-effect",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "019de8a0-4649-73c2-b5a5-bb8a813275e4",
      "evidence": "two-column icon grid lists eligible PPP sectors",
      "confidence": 65
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 51,
      "from": 39,
      "beatId": "019de8a0-39dc-761f-9b3d-a3283b0bdae7",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Evidence & Proof",
      "beatSlug": null,
      "evidence": "M&A volumes, FDI inflows, PPP project pipeline as proof of activity",
      "position": 4,
      "confidence": 70,
      "parentBeatName": null,
      "parentBeatSlug": null
    },
    {
      "to": 51,
      "from": 39,
      "beatId": "019de8a0-3a7e-721d-84e5-997df7313fbd",
      "arcName": "The Triple Take",
      "arcSlug": "triple-take",
      "beatName": "The Implications (So What)",
      "beatSlug": null,
      "evidence": "Deal flow and FDI patterns reveal opportunity zones",
      "position": 2,
      "confidence": 55,
      "parentBeatName": null,
      "parentBeatSlug": null
    }
  ],
  "loops": [
    {
      "to": 51,
      "from": 48,
      "name": "Build Up",
      "slug": "33-build-up",
      "bestFor": "Pricing justification, cost estimation, market sizing",
      "matchId": "019de8a0-3c33-770d-9d4d-cd901f846663",
      "evidence": "p48 234 total projects, p49 four-table breakdown, p50 photo gallery, p51 eligible-sector list",
      "position": 10,
      "objective": "Build the PPP picture from totals to project-types",
      "structure": "The Base -> Add Component A -> Add Component B -> Add Component C -> The Total",
      "confidence": 65,
      "description": "Start from zero and add components to arrive at a total"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}